Laserfiche WebLink
Y <br /> C <br /> An <br /> aver d�eosrsrr r�j~. Entirunnu"nt-1 5nluhprts <br /> ti u[c�',t Qtmp,ur> 7hrurtgh APPGed Science, <br /> Engineering S Ct,nslruefion <br /> i 1 h-�(_;ul(l Camit[7ritt°.5uia[ 2(7[l <br /> :� lt,tiu 4tn Cosrin�,t, <br /> CA`15(,7() <br /> FAX 0161 tS',"�-b(tllti <br /> SITE SAFETY pLAN No- 30008-35 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at 076 <br /> ARCO Service Station No.2 <br /> 800 East Kettleman Lane <br /> Lodi, California <br /> (August 26, 1991) <br /> INTRODUCTION <br /> describes basic safety requirements Car the subsurface environmental <br /> This Site Safety this <br /> Plan d l to the employees of App <br /> investigation. The provisions set forth mon this ed <br /> of the project. The subcontractors <br /> . r rade or increase the safety <br /> GeoSystems and its subcontractors working lied GeoSystems, as designated and <br /> may elect is <br /> and onlytwi h theese °conccurrence ofvisions, but nAppo upg <br /> requiremen , <br /> accepted in writing• be encountered <br /> Plan will address the expected potential hazards that May approval of the <br /> r.:. This site Safety Field activities arc planned to begin uF <br /> on the worksite for this project.- Enviies arcn l Health Division with the duration <br /> work plan by the San Joaquin County Applied <br /> ang <br /> estimat <br /> ed at approximately 1 month after thda to ihistpIan will be provided by working pP <br /> conditions occur as activities progress, addenda <br /> GeoSystems. <br /> AUTHORITY FOR SITE SAFETI' <br /> Personnel responsible for project safety are the Project Manager <br /> The Applied GeoSystems p Coordinator is responsible for <br /> to audit the <br /> and the Staff Ceologist or Engineer. the Health and ro ramav <br /> all A plied GeoSystems Health and S tion program <br /> correct defic encies.sP The Project <br /> the over P ac providing a copy <br /> site for compliance and take appropriate <br /> En Engineer, and for advising the Staff GeQlogist or <br /> is responsible for implementing the provisions of this Plan, for p <br /> ist Or <br /> Manager �'aff Geologist or g <br /> of this Plan to the .. Project Manager and Staff Geologist <br /> to audit site activities for compliance with the provisions of this <br /> Engineer on health and safety matters. The <br /> Engineer have the autharity practices or dismiss subcontractors whose conduct <br /> Plan. They may suspend or rn work <br /> Plan- <br /> does not meet the requirementiss specifted in this Plan- <br /> 3WS-3s <br />