My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012744
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
3500 - Local Oversight Program
>
PR0545339
>
ARCHIVED REPORTS_XR0012744
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2020 7:22:06 PM
Creation date
2/11/2020 4:43:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012744
RECORD_ID
PR0545339
PE
3528
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
02
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> C <br /> An <br /> aver d�eosrsrr r�j~. Entirunnu"nt-1 5nluhprts <br /> ti u[c�',t Qtmp,ur> 7hrurtgh APPGed Science, <br /> Engineering S Ct,nslruefion <br /> i 1 h-�(_;ul(l Camit[7ritt°.5uia[ 2(7[l <br /> :� lt,tiu 4tn Cosrin�,t, <br /> CA`15(,7() <br /> FAX 0161 tS',"�-b(tllti <br /> SITE SAFETY pLAN No- 30008-35 <br /> SUBSURFACE ENVIRONMENTAL INVESTIGATION <br /> at 076 <br /> ARCO Service Station No.2 <br /> 800 East Kettleman Lane <br /> Lodi, California <br /> (August 26, 1991) <br /> INTRODUCTION <br /> describes basic safety requirements Car the subsurface environmental <br /> This Site Safety this <br /> Plan d l to the employees of App <br /> investigation. The provisions set forth mon this ed <br /> of the project. The subcontractors <br /> . r rade or increase the safety <br /> GeoSystems and its subcontractors working lied GeoSystems, as designated and <br /> may elect is <br /> and onlytwi h theese °conccurrence ofvisions, but nAppo upg <br /> requiremen , <br /> accepted in writing• be encountered <br /> Plan will address the expected potential hazards that May approval of the <br /> r.:. This site Safety Field activities arc planned to begin uF <br /> on the worksite for this project.- Enviies arcn l Health Division with the duration <br /> work plan by the San Joaquin County Applied <br /> ang <br /> estimat <br /> ed at approximately 1 month after thda to ihistpIan will be provided by working pP <br /> conditions occur as activities progress, addenda <br /> GeoSystems. <br /> AUTHORITY FOR SITE SAFETI' <br /> Personnel responsible for project safety are the Project Manager <br /> The Applied GeoSystems p Coordinator is responsible for <br /> to audit the <br /> and the Staff Ceologist or Engineer. the Health and ro ramav <br /> all A plied GeoSystems Health and S tion program <br /> correct defic encies.sP The Project <br /> the over P ac providing a copy <br /> site for compliance and take appropriate <br /> En Engineer, and for advising the Staff GeQlogist or <br /> is responsible for implementing the provisions of this Plan, for p <br /> ist Or <br /> Manager �'aff Geologist or g <br /> of this Plan to the .. Project Manager and Staff Geologist <br /> to audit site activities for compliance with the provisions of this <br /> Engineer on health and safety matters. The <br /> Engineer have the autharity practices or dismiss subcontractors whose conduct <br /> Plan. They may suspend or rn work <br /> Plan- <br /> does not meet the requirementiss specifted in this Plan- <br /> 3WS-3s <br />
The URL can be used to link to this page
Your browser does not support the video tag.