Laserfiche WebLink
F <br /> F <br /> Site Safety Plan <br /> ARCO Station No. 2076, Lodi. California ENNA <br /> SAFETY AND ORIENTATION MEETING <br /> tend a project" <br /> Field personnel from Applied GeoSystemand review nd its �he proJeotswill taslcs btefore hc,�inning <br /> speing far safety Issues <br /> cific training meetwork. The meeting will be led by the Project Manager or Staff Geologist or Engineer. In <br /> addition, fit-testing of respiratory protective devices will be conducted as part of the safety <br /> orientation meeting when the use of a respirator may be required. <br /> ,.-., <br /> HAZARD ASSESSMENT <br /> The major contaminants expected to be encountered on the project are gasoline and its <br /> The anticipated contaminants and their exposure standards are <br /> hydrocarbon constituents. hat the levels <br /> listed in Table L It is not an" dtreshold limit values (TLV). Inhalation and dermal <br /> permissible exposure limits (PEL) o <br /> pathways. Protective clothing v'elclevm �s areequir do field <br /> contact are the potential exposure to <br /> personnel specified in this Plan. In addition, respiratory p <br /> be worn by each person onsite or to be within easy reach should irritating odors be detected <br /> or irritation of the respiratory tract occur. <br /> t <br /> - ------ <br /> 30008-35 <br />