Laserfiche WebLink
MOM <br /> "" � a'nza`� ->_. g.. ate'• `Y <br /> .c F" - .P"•-. f3 '.. 1 E'SITS:d� <br /> W <br /> Site Saf—et-y-Plan <br /> Field work performed by Applied GeoSystems, Inc./RESNA Industries (RESNA) at the site <br /> will be conducted in accordance worsaSitety <br /> an. This pwill <br /> describe <br /> bt <br /> safety requirements fordrilling <br /> ringsl bn 'ngsthsite. The SteSafetyPlan will be <br /> applicable to personnel and subcontractorsof RESNA. RESNA personnel and <br /> k at <br /> on <br /> contents of tile <br /> subcontractors scheduledto <br /> k rfo !yA copy tile <br /> of the Site Safety P1 n will cbe available for <br /> Site Safety Plan beforebegins. <br /> reference by appropriate parties during the work. The onsite Staff Geologist of RESNA will <br /> act as the Site Safety Officer, <br /> Soil Sr aJ amplin <br /> During sampling,the geologist will use a field photoionization detector(PID)to characterize <br /> the relative levels of hydrocarbons. Field insirubut' ts do not detecas t tile concentration concentratiouseful <br /> nfor of <br /> indicating relative levels of hydrocarbon vapors, in <br /> hydrocarbons present with the same <br /> precision yas laboratory <br /> abra�sampling One <br /> be tested in <br /> brass sleeves not selected for laboratory lacin the intake probe of the PID <br /> the field using an PID. This testing will be performed by placing <br /> against the soil after opening the brass container. <br /> Soil Samlin in Tank Cavity <br /> bucket, and the outer soil <br /> The soil will be brought to the ground surface clean brass tube will be driven in <br /> excavator <br /> be scraped away. A clean,6-inch long.2-inch-diameter, <br /> the soil using a percussion sampler. <br /> The brass tube will be removed be and <br /> and immedthe ends eatelytgia1ed on ouminum f for transport l 'to the <br /> caps and taped. The tub <br /> laboratory. Chain of Custody Records will be maintained throughout delivery to the <br /> laboratory. <br /> Sampling Stock filed Soii <br /> Soil samples will also be collected from the stockpiled 0 cubic vards of stockpiledoil to evaluate treatment so disposal <br /> Each <br /> options. Four soil samples will be collected for every le b the laboratory. Soil samples <br /> group of four samples will be cnmposited into one samp Y <br /> will be collected in clean brass tubes from approximately 6 inches below the surface of the <br /> stockpiles. <br /> ieJ <br />