Laserfiche WebLink
Mr. Rick Sisk <br /> Page 2 <br /> I <br /> Unfortunately, as a result of the above mentioned concerns, PHS/EHD <br /> can not issue partial (soil) closure of this site at this time. It <br /> is recommended that to expedite reconsideration, a work <br /> plan/proposal be submitted as soon as possible. The work plan <br /> should focus on the issues outlined in this response. <br /> i <br /> As a side note, PHS/EHD staff recently spoke with Mr. Tim Ross of <br /> Kaprealian Engineering regarding fecal coliform testing of MW-3 , <br /> MW-8 , and MW-9, since they appear to he within 50 feet of sanitary <br /> sewer lines. This issue had been discussed with Mr. Doug Lee at <br /> the time of installation and is a requirement of San Joaquin <br /> County's well ordinance. Please include the results of the fecal <br /> coliform testing in your next Quarterly Report. <br /> II <br /> Should you have any additional questions, concerns, or wish to <br /> schedule well sampling, please contact Steven Schneider, Senior <br /> R.E.H.S. , of my staff at (209) 468-34 1. <br /> Jogi Khanna-F—M.D. , M.P.H. <br /> Health Officer <br /> � � r <br /> orf <br /> Laurie�A. Cot IEH Program Manager <br /> Environmental Health Division <br /> /LAC/SS: lb <br /> c: Elizabeth Thayer - CVRWQCB <br /> V <br /> i <br /> i <br /> I <br />