Laserfiche WebLink
KEI-P91-0202 .QR1 <br /> May 4 , 1992 <br /> Page 3 <br /> Analytical results of these samples also indicated non-detectable <br /> levels of both total lead and EDB for all six samples. Analytical <br /> results of the soil samples collected fter additional excavation <br /> at sample point C2 [i.e. , mgles C2(26) SSW .W S, §W-E., and_Si� <br /> nd'- cated'�benzen�l_ev_eTs_at-0:.,0.0. 7 p}am_and 0 057 p f4 samples <br /> SW N• and_S.W 'I respectively, while samples C2 (26)_ SW=�5 "and;' 5W-W <br /> shote level of TPgas,oline raaagng_fram_2_._5_p. m tQ-6_.1_pp <br /> X. .. } ene�euels�rang�ng=fram-o=..19 pp. to 0.57 pp Samples SW- <br /> N and SW-E showed non--detectable levels of TPH as gasoline. <br /> Analytical results of the 11 p96dac_t-p :pe trent ; mpmpie' indicated <br /> non-detectable levels of TPH asgasoline, total lead, and EDB for <br /> all samples, with 'ben'z`e'ne eve:ls_ranc ng_...from-0.._GG6:8_ ppm o_0.._Q1.8 <br /> p.'p.., The analytical results also indicated non-detectable levels <br /> o PH as diesel for samples P1 through P3 . <br /> The analy_tica-l_re$ lts of the soil samples collected from beneath <br /> e ate_ al�taii�t and remote f_i1lline (samples WO1 and P12") <br /> ltcicated non-detectable levels of TEPH, BTX&E, PCB' s, and all EPA <br /> method 8010 constituents for both samples. The analytical results <br /> also indicated-a_non,_dete.�ctab.le level of TPH as gasoline for sample <br /> ;; T�h`e_metal--concentrations-f.or each—sample_axe_as_indicated_iA <br /> T:A 1e�b. The results of the soil analyses are summarized in Tables <br /> 5 and 6. <br /> To comply with the requirements of the regulatory agencies and <br /> based on the analytical results, KEI proposed the installation of <br /> three monitoring wells. Documentation of tank removal protocol, <br /> soil sample collection techniques, and the analytical results of <br /> the soil samples from the tank excavation are summarized in KEI ' s <br /> report (KEI-J91-0202 .R1) dated April 9 , 1991. <br /> On August 27 , 28 , and 29, 1991, three two-inch diameter monitoring <br /> wells (designed as MW1, MW2 , and MW3 on the attached Site Plan, <br /> Figure 1) were installed at the site. The monitoring wells were <br /> drilled and completed to total depths ranging from 82 to 86 feet <br /> below grade. ate was encountered at depths ranging from <br /> 73 to 7,5 n <br /> , feet 'beeath ah �surfa <br /> e ' during drilling. <br /> The surface of each well cover was surveyed by Kier & Wright of <br /> Pleasanton, California, to Mean Sea Level (MSL) and to a vertical <br /> accuracy of 0. 01 feet. <br /> The wells were attempted to be developed on September 3 , 1991. <br /> However, field data collected indicated that sand and silt <br /> materials remained in the water within the well casing. The wells <br /> were initially sampled on September 9, 1991. <br />