Laserfiche WebLink
AVELL COMPLETION DIAGRA?13 <br /> PROJECT NAME:_ 1 ln(val - Lodi.Keuleman Lane _ _ = WELL NO. hfW _ <br /> PROJECT NUMBER: KEl-P91 202 <br /> WELL PER NIIT NO.: <br /> Flush-mounted Well Cover <br /> 117 A. Total Depth: 8l' <br /> B. Boring Diameter*: 9" <br /> Drilling Method:_ Holig", Stem Auer <br /> ` D C. Casing Length: 80' — <br /> Material: Schedule 40 PVC <br /> D. Casing Diameter: OD = 2.375" <br /> E D =-2.Q67" -- <br /> E. Depth to Perforations: 55' <br /> F. Perforated Length: 15' <br /> A Perforation Type: Machined Slot <br /> Perforation Size: 0.020" <br /> C <br /> G. Surface Seal: 01' . <br /> I Seal Material: Neat Cement_.,, <br /> H. Seal: 2' <br /> Seal Material: BentQnite <br /> F <br /> I. Filter Pack: 18' <br /> Pack Material: RMC Unestar Sand <br /> Size: #13 <br /> J. Bottom Seal: none <br /> J Seal Material:— NIA — <br /> i B <br /> * Boring diameter can vary from 8-114" to 9"depending on bit wear. <br />