Laserfiche WebLink
Case Closure Summary Page 2 <br /> Le'aking Underground Fuel Storage Tank P,11gram <br /> III. Release and Site Characterization Information (continued) <br /> Maximum Documented Contaminant Concentrations -- Before and After Cleanup <br /> Contaminant Soil (ppm) Water (ppm) Contaminant Soil (ppm) Water (ppm) <br /> Before After Before After Before After Before After <br /> TPH (Gas) 22 180 <0.05 Xyle ne <0.005 <0.e006 <0.0005 <br /> TPH (Diesel) NA NA NA Eth [benzene 0.11 <0.0005 <0.0005 <br /> Benzene <0.005 <0.0005 <0.0005 Oil &Grease NA NA NA <br /> Toluene <0.005 <0.0005 <0.0005 Hea ry Metals NA NA NA <br /> MTE E 121 1 1180 <0.001 <br /> Comments: <br /> Soil before concentrations are from soil boring B6-55' in the source area. No soil confirmation samples were collected after <br /> soil vapor extraction remediation or ground water pump and treat. Groundwater before and after concentrations are from on- <br /> site well MW-2, which was the most impacted well. <br /> IV. Closure <br /> Does completed corrective action protect existing beneficial uses pe the Regional Board Basin Plan?Yes <br /> Does completed corrective action protect potential beneficial uses per the Regional Board Basin Plan? Yes <br /> Does corrective action protect public health for current land use? Ye <br /> Site management requirements: None <br /> Should corrective action be reviewed if land use changes? Yes <br /> Monitoring/Remediation Wells Decommissioned? Yes Number Decommissioned: 14 Number retained: 0 <br /> List enforcement actions taken: NOR sent to RP <br /> List enforcement actions rescinded: None <br /> V. Local Agency Representative Data <br /> Name: Donna Heran, RENS Title: Director <br /> Signature: Date: <br /> 3- T- <br /> VI. Central Valley Regional Water Quality Control Board Notification <br /> Date Submitted to RB: 09/27/2011 Response Date: 10/21/2011 <br /> RB Staff: J. Barton Response: NFAR Concurrence <br /> Title: En ineerin Geologist <br /> VII. Additional Comments, Data, etc. <br /> This document and the related CASE CLOSURE LETTER shall be retained by the lead agency as part of the official site file. <br />