Laserfiche WebLink
DEC-23-2004 12:47 SERUICE STATION SYSTEM 408 971 0135 P.05 <br /> Monitoring System Certification- -,3 of 3 <br /> ,A <br /> Site Address: 7700 Moreland Ct.@ Hwy. 99 Date of Testing/Servicing - <br /> . �/3/04 <br /> F. In-Tank Gauging/SIR Equipment: eek this box if tank gauging is used only for inventory control. <br /> v ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist; <br /> Yes ❑No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> es ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑No* Was accuracy of system water level readings tested? <br /> Yes ❑No* Were all probes reinstalled properly? <br /> es 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): q Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> 0'N/A (Check all that apply) Simulated leak reate:,W 3 g.p_h. (I.); ❑ 0.1 g.p.h.(2.); ❑ 0.2 g.p.h. (2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> Yes ❑No* Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> Yes a No* Was the testing apparatus properly calibrated? <br /> ❑ es —ENo* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> • /A <br /> k-yes 0 No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> Yes ❑No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> Yes 0 No* For electronic LIX's,does the turbine automatically shut off if any portion of the monitoring system <br /> 0 N/A malfunctions or fails a test? <br /> Yes ❑No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 119 Yes p No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H below,describe how and when these defleiencies were or will be corrected. <br /> 114. Comments: <br />