My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Site Preparation and In 'lation Instructions <br /> TLS-350 UST Monitoring .,ystem <br /> TABLE OF CONTENTS <br /> SECTION 1. INTRODUCTION SECTION 7. INTERSTITIAL LIQUID SENSOR <br /> ., INSTALLATION <br /> A. General......................................................................1 <br /> B. Damage Claims.........................................................1 A. Equipment Preparation..........................................28 <br /> C. Return Shipping .......................................................1 B. Installation of Float-Switch Type Interstitial <br /> Sensor—Steel Tanks..............................................29 <br /> SECTION 2. PRODUCT DESCRIPTION C. Installation of Float-Switch Interstitial <br /> Sensor—Fiberglass Tanks.....................................29 <br /> A. Monitor......................................................................1 D. Installation of Discriminating Interstitial <br /> B. Probes........................................................................5 Sensor—Fiberglass Tanks .....................................31 <br /> C. Sensors ......................................................................5 <br /> D. Line Leak Detectors .................................................5 SECTION& HYDROSTATIC SENSOR <br /> E. Remote Display.........................................................5 INSTALLATION <br /> SECTION 3. SITE PREPARATION A. Equipment Preparation..........................................32 <br /> B. Sensor Wiring .........................................................32 <br /> A. Probe Riser Pipe Installation...................................5 C. Pre-Installation Sensor Testing.............................32 <br /> B. Interstitial Liquid Sensor Riser Pipe Installation..6 D. Installation of Dual-Float Hydrostatic Sensor......33 <br /> C. Monitor Location Selection ......................................7 E. Installation of Single-Float Hydrostatic Sensor ...33 <br /> D. Power Wiring Conduit Installation .........................7 <br /> E. Probe and Sensor Wiring Conduit Installation.......7 SECTION 9.PIPING SUMP SENSOR <br /> F. Probe and Sensor Junction Box Installation...........8 INSTALLATION ..................................34 <br /> G. Manhole Installation................................................9 <br /> H. Intrinsically Safe Wiring Installation .....................9 A. General....................................................................34 <br /> I. Power Wire Installation ...........................................9 B. Installation..............................................................34 <br /> SECTION 4. TLS-350 MONITOR INSTALLATION SECTION 10.VAPOR SENSOR <br /> INSTALLATION ................................35 <br /> A. Mounting.................................................................14 <br /> B. General Wiring Practices .......................................14 SECTION 11. DISPENSER PAN SENSOR <br /> C. Module/Connector Positions and Labeling............15 INSTALLATION <br /> D. Power Wiring Connections.....................................17 <br /> E. Probe and Sensor Wiring Connections..................17 A. General....................................................................37 <br /> F. Relay Output Wiring..............................................19 B. Installation..............................................................37 <br /> G. External Input Wiring............................................20 <br /> H. Pump Sense Interface Module SECTION 12. CONTAINMENT SUMP SENSOR <br /> Wiring Connections ................................................20 INSTALLATION <br /> I. EIA RS-232 Interfaces............................................21 <br /> J. SiteFax Fax/Modem and Internal Modem A. General....................................................................38 <br /> Interfaces ................................................................21 B. Installation..............................................................39 <br /> SECTION 5. CAPACITANCE PROBE SECTION 13. GROUNDWATER SENSOR <br /> INSTALLATION INSTALLATION................................40 <br /> A. Tank Diameter Measurement................................21 SECTION 14. WARRANTY CONDITIONS AND <br /> B. Riser Pipe Cap Preparation ...................................21 LIMITATIONS OF LIABILITY <br /> C. Installation..............................................................22 <br /> A. Limitations of Liability ..........................................42 <br /> SECTION 6. MAGNETOSTRICTIVE PROBE B. Inspection................................................................42 <br /> INSTALLATION C. Limitation of Remedy and Warranty ....................42 <br /> D. Limitation of Damages...........................................42 <br /> A. Tank Diameter Measurement................................23 E. Limitation of Actions..............................................42 <br /> B. Riser Cap Preparation............................................24 F. Collateral Promises 42 <br /> C. Probe Riser Adaptor Installation...........................24 G. Interpretation .........................................................42 <br /> D. Float Assemblies.....................................................25 <br /> E. Probe Installation in Underground APPENDIX A. WIRING RECORD— <br /> Storage Tanks.........................................................26 INTRINSICALLY SAFE AREA......43 <br /> F. Probe Installation in Aboveground <br /> Storage Tanks.........................................................27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.