My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Preparatioi d Installation InstructionsT <br /> TL_ ,50 UST Monitoring System <br /> • Printer Interface Module.Required for interface This section does not contain site preparation instructions <br /> between the CPU board and integral printer. for a line leak detector.Since much of the site preparation <br /> • Remote Display Interface Module.Required for for a line leak detector will be performed concurrently <br /> interface to a Veeder-Root Remote Display. with the site preparation for the rest ofthe system,be sure <br /> • Remote Printer Interface Module.Provides a 25- to consider its requirements at all times. <br /> pin male D-connector for data transmission to a <br /> remote serial printer. If installing line leak detectors with this system,be sure <br /> • SiteFax Fax/Modem Module.A 2400-baud inter- to refer to Manual Number 576013-764 for site prepara- <br /> nal modem and a 9600-baud facsimile with twin tion and installation instructions. <br /> snap-in jacks for direct data transmission over phone <br /> lines. A. PROBE RISER PIPE INSTALLATION. <br /> B. PROBES. (See Figure 4, "Capacitance Probe Installation Require- <br /> ments," and Figure 5, "Magnetostrictive Probe Installa- <br /> The TLS-350 can accommodate Veeder-Root capacitance tion Requirements.") <br /> and magnetostrictive probes.The installation and wiring <br /> procedures for these probes are described in this manual. IMPORTANT:For maximum height-to-volume accuracy, <br /> select the threaded hole closest to the middle of the tank <br /> C. SENSORS. and install a 4-inch riser pipe (ANSI pipe, sch. 40). <br /> A TIS-350 system can incorporate sensors that detect Standard procedures for installing a fill pipe can be used. <br /> liquids in interstitial spaces of double-wall tanks and piping Instructions are based on a 4-inch riser pipe,however,the <br /> sumps of double-wall piping, detect hydrocarbon liquids capacitance probes will also fit a 3-inch riser. <br /> and vapors in monitoring wells, and detect liquids and <br /> hydrocarbons in dispenser pans and containment sumps. 1. If the tank is buried,excavate the portion of the tank <br /> Interstitial,piping sump and hydrostatic sensors are two- that contains the riser hole. <br /> wire devices;while vapor and groundwater sensors, and 2. Remove the bung from the hole and install the riser <br /> containment sump and the dispenser pan sensors are pipe. <br /> three-wire devices. The installation and wiring proce- <br /> dures for these sensors are described in this manual. NOTE:The top of the riser pipe must be threaded to <br /> accept a 4 x 8 NPT cap adaptor ring. <br /> D. LINE LEAK DETECTORS. <br /> The TLS-350 system can include up to eight line leak <br /> detectors monitoring one line per detector, and each <br /> detector requires one Line Leak Detector Module in- <br /> M:NiMUM OIA <br /> stalled in the monitor. Site preparation and installation OLE <br /> instructions for the Veeder-Root Line Leak Detector are 3R <br /> "C <br /> ' TE SLAB <br /> CAEO EAR*� ?CORD GRIP SEALS <br /> PER NFPA 9p SUPPLIED WITH PROBE <br /> contained in Manual Number 576013-764. <br /> E. REMOTE DISPLAY. <br /> STRAIN WEN TIIONHERPROOF <br /> RELIEF v u CBOx wlfn <br /> The TLS-350 system can interface to a Veeder-Root Re- `""'"— �'C`ICINCA, <br /> 6 CUBIC <br /> mote Display. Site preparation and installation instruc- EE X. <br /> M SEAL <br /> tions for the Remote Display are contained in Manual EC <br /> A <br /> Number 576013-811. -NOE;E SUF�IE-11. <br /> R15EA DIMENSION PROBE <br /> SHOULD BE XITO <br /> THE BOTTOM OF +00 AP I PIPE <br /> SECTION 3. SITE PREPARATION HE RISER CAP SCHED-E. <br /> WARNING: IN INSTALLATION OF THIS <br /> PRODUCT, COMPLY WITH THE NATIONAL <br /> ELECTRICAL CODE;FEDERAL,STATE AND <br /> LOCAL CODES; AND OTHER APPLICABLE ""'""`E <br /> BE <br /> SAFETY CODES. <br /> WARNING: TO PROTECT YOURSELF AND <br /> OTHERS FROM BEING STRUCK BY VE- <br /> HICLES DURING WORK,BLOCK OFF YOUR <br /> WORK AREA DURING INSTALLATION OR <br /> SERVICE. <br /> nn,nr wrI PIP,,,— <br /> FAILURE <br /> IP,,,— <br /> FAILURE TO COMPLY WITH THESE WARN- . ne rP,mPm,PP,Pe.rPPP.,P.rPPmI <br /> INGS COULD RESULT IN DEATH, SERIOUS <br /> PERSONAL INJURY,PROPERTY LOSS,AND <br /> EQUIPMENT DAMAGE. Figure 4. Capacitance Probe Installation Requirements. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.