Laserfiche WebLink
Contents <br /> Figures <br /> Figure 1. Location of Precision Check Valve in FE Petro Pump ........... 4 <br /> Figure 2. Comparison of Standard and Precision Check Valves........... 5 <br /> Figure 3. Dip Switch and Rotary Switch in FE Petro Variable <br /> SpeedPump........................................................................... 8 <br /> Figure 4. PLLD System Wiring Diagram.............................................. 14 <br /> Figure 5. Pump Port Strainer Installation............................................. 19 <br /> Figure 6. In-Line PLLD Check Valve Installation................................. 21 <br /> Figure 7. Sealing Surface for SwiftCheck Valve's External O-ring...... 22 <br /> Figure 8. SwiftCheck Valve and Line Leak Sensor Installation........... 23 <br /> Figure 9. Manifolded Product Lines PLLD Installation......................... 25 <br /> Figure 10. Wiring Diagram - Manifolded Product Lines PLLD............... 26 <br /> Figure 11. PLLD Installation with Healy Mini-Jet System (Required <br /> Dielectric Union and Shutoff Valve Not Shown)................... 27 <br /> Figure 12. Functional Element Diagram for Red Jacket Pumps............ 28 <br /> Figure 13. Submerged Pump and Manifold for Tokheim Pumps........... 30 <br /> Figure 14. Siphon or Suspension Valve Assembly for Bennett Pumps. 31 <br /> Figure 15. PLLD Line Leak Sensor Installation..................................... 32 <br /> Figure 16. Epoxy Sealant Connections................................................. 35 <br /> Figure 17. Pressurized Line Leak Detection System and Pump Control <br /> Diagram for Red Jacket Relay Control Box.......................... 37 <br /> Figure 18. Pressurized Line Leak Detection System and Pump Control <br /> Diagram for Non-Red Jacket Relay Control Box.................. 38 <br /> Figure19. WARNING Tag..................................................................... 39 <br /> 576013-902,Revision G V <br />