My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:51:58 PM
Creation date
2/12/2020 10:13:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preparing the Site <br /> As you prepare the site,you need to consider: <br /> Cl Manholes <br /> ❑ Submersible pumps <br /> ❑ Stage II Vapor Recovery system <br /> ❑ Piping runs <br /> ❑ Manifolded product lines <br /> Manholes <br /> For installing PLLD with in-line check valve on a submersible pump,the <br /> recommended minimum manhole size is 30-inches. <br /> There is no minimum size required for FE Petro submersible pumps or SwiftCheck <br /> Valves.The line leak sensor screws directly into the pump head. <br /> Submersible Pump <br /> For proper system operation,the submersible pump H.P.must not exceed 1'/z H.P.The <br /> PLLD system is not qualified for use with Red Jacket X3 and X5 model submersible <br /> pumps,Red Jacket"Big Flo"submersible pumps(3-inch discharge),and FE Petro <br /> STPH 150,550-3-S,and 550-5-S model pumps. <br /> Pump output pressure must be 23 psi minimum. <br /> Stage II Vapor Recovery <br /> If there is a Stage II Vapor Recovery system installed that includes a device in the <br /> pressurized piping,such as a Healy Mini-JetTm,see"PLLD Installation with Stage II <br /> Vapor Recovery Systems"on page 27 for installation guidelines. <br /> Piping Runs <br /> Where piping runs have been installed for future use,but are connected to the active <br /> piping system,isolate the inactive lines from the active lines using a shutoff valve. <br /> Failure to do so may cause erratic system performance. <br /> 576013-902,Revision G 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.