Laserfiche WebLink
Pump Control Wiring for PLLD Controller Module Installing Field Wiring and Conduit <br /> S. Install the watertight cord grip(famished)into the junction box. <br /> Important aw Seal the conduit between the TLS monitor and the Line Leak Sensor junction box within <br /> the submersible pump manhole and the boundary where they pass from a Class 1, <br /> Division I area into a nonhazardous area in accordance with the National Electrical <br /> Code(NFPA 70)and the Automotive and Marine Service Station Code(NFPA 30A). <br /> Pump Control Wiring for PLLD Controller <br /> Module <br /> Pull two#14 AWG color-coded or marked wires for each PLLD Controller Module <br /> between the power area of the TLS monitor and the submersible pump relay control <br /> box. <br /> Important ar Dispensers and console must be wired to the same leg of incoming power at the main <br /> electrical panel,otherwise damage may result to dispensers and console. <br /> Since wiring for multiple pump controls may be entering the TLS-350 or TLS-350R <br /> monitor through the same conduit opening,be sure to color code or mark each wire <br /> to identify its source! <br /> 1. Run conduit from the TLS monitor power area to the submersible pump relay con- <br /> trol box.The conduit must be large enough to fit two#14 AWG wires for each <br /> pump control leg you are installing. <br /> 2. There are knockouts for%-inch, 1-inch or I%<-inch conduit in the monitor box. <br /> When deciding on the size and number of conduits required,consider the number <br /> of wires entering the monitor. <br /> Wiring for PLLD Controller Module Power <br /> For each PLLD system,pull two#14 wires(one black and one white)between a <br /> 15-amp circuit breaker on the main power panel and the Power Area of the TLS-350 <br /> or TLS-350R monitor. <br /> 16 576013-902, Revision G <br />