Laserfiche WebLink
SHELL LEAK RESPONSE PLAN <br /> INTRODUCTION <br /> IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE SHELL <br /> OIL COMPANY FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT SHELL FACILITIES. DESIGN <br /> AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER TO <br /> REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br /> RESPONSIBLE SHELL PERSONNEL <br /> NAME TITLE PHONE <br /> Randy Carroll Manager Day 209-957-5398 <br /> 24br 209-957-6612 <br /> Jeff Granberry Project Engineer Work 510-675-6145 <br /> Home 510-673-0753 <br /> Jeff Byram District Engineer Work 510-675-6146 <br /> Home 510-674-9413 <br /> Dan T. Kirk Environmental Engineer Work 510-675-6168 <br /> Home 510-283-8573 <br /> RESPONSIBLE CONTRACTOR <br /> SERVICE STATION SYSTEMS, INC 800-887-8009 24 HOURS <br /> 1236 NORTH 5TH STREET <br /> SAN JOSE, CA 95112 <br /> LEAK VERIFICATION <br /> WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br /> PROCEDURES WILL APPLY: <br /> 1. THE SHELL ENGINEER WILL ARRANGE FOR THE SHELL TERRITORY MANAGER TO IMMEDIATELY (THE <br /> SAME DAY) VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br /> INVENTORY RECORDS. <br /> 2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br /> ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br /> OPERATION (ON REMOTE SYSTEMS). <br /> 3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br /> SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br /> 4. IF THE ABOVE INVESTIGATIONS• PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br /> IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br /> MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br /> LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br /> NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br /> 5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br /> DETERMINE THE LEAK SOURCE. <br /> 9 <br />