Laserfiche WebLink
4 <br /> SECTION 3 <br /> EVACUATION PROCEDURES <br /> A. EMPLOYEE EVACUATION <br /> Evacuation Leader Gary Beauchamp / Efrain Cardenas/ Richard Greer <br /> Shift Hours Number of Employees <br /> 1. Day 5:00 AM to 3:30 PM 22 <br /> Method of Employee Notification ( i.e., siren, public address system, verbal...) <br /> Bay Alarm Fire System ( Bell) on North Wall of Shop, Verbal. <br /> Evacuation Routes Posted( Yes/No) Yes <br /> Assembly Area(s) for Evacuation. <br /> Exit to the front of the building to meet in parking lot. <br /> B. SURROUNDING OCCUPANCIES AND LAND USE WITHIN 1/8 MILE. <br /> (i.e., schools hospitals, residential, commercial, open space...) <br /> North Industrial Building <br /> South Industrial Building <br /> East Open Empty Field <br /> West Open Empty Field <br /> 3 <br />