Laserfiche WebLink
RAMB LL ENVIRON <br /> <br />Borings will be abandoned using neat cement grout (including up to 5% by weight bentonite powder or <br />chips) and pvc tremie pipe. Grout will be pumped into borings as necessary. Soil generated from drill <br />cuttings and wastewater generated during site activities will be contained onsite in 55 gallon drums and <br />sampled for characterization and disposal classification. <br />C: \Users \TWinger\Desktop \Reyes \Scopes \Stockton, California Phase II Scope.docx <br />2/2