My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
18819
>
2900 - Site Mitigation Program
>
PR0544748
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:23:04 AM
Creation date
2/12/2020 11:58:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544748
PE
2965
FACILITY_ID
FA0015599
FACILITY_NAME
CHOCOHOLICS DIVINE DESSERTS
STREET_NUMBER
18819
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227
APN
01924018
CURRENT_STATUS
02
SITE_LOCATION
18819 E HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GAr( <br /> ro. 24 Jan 05 <br /> I have also contracted with Parrish and Sons, the contractor who installed the system, <br /> in inspecting the operating characteristics, measure system parameters, and assist in <br /> the preparation of the O and M procedures. <br /> The following three items have not been submitted by the deadlines specified: <br /> 1. Provision F.1.a - Report Certifying New Wastewater System has been <br /> constructed as Described Prior to Initial Discharge <br /> Compliance Plan: This report has been completed and will be submitted <br /> under separate cover, by the 01 March 2005 extension date. The report <br /> will consist of design drawings, as built drawings, and copies of <br /> inspections and approvals by the San Joaquin County Environmental <br /> Health Department, the installing contractor, and the general contractor. <br /> 2. Provision F.1.b — Submittal.of O and M plan <br /> Compliance Plan: The information has been gathered from Orenco <br /> (equipment manufacturer), the San Joaquin County Environmental Health <br /> Department, Parrish and Sons (installing contractor), and Neil O. <br /> Anderson & Associates (Environmental Consultant). This report needs to <br /> be compiled and reviewed. The competed report will be submitted under <br /> separate cover, no later than 01 March 2005. <br /> 3. Provision F.3 — Monitoring and Reporting Program Report <br /> Compliance Plan: <br /> a. Septic Tank Monitoring: The tanks have been inspected with the <br /> assistance of Parrish and Sons and Neil O. Anderson & Associates. The <br /> report needs to be prepared and will be submitted as part of our annual <br /> report. <br /> b. Effluent Monitoring: Samples of effluent were obtained by Neil O. <br /> Anderson & Associates on January 21, 2005 and have been submitted for <br /> analysis. The results will be contained in our next monthly report. <br /> c. Dispersal Areas Monitoring: Visual inspections of the leach field have <br /> been ongoing. Better record keeping however is needed to document <br /> inspections. The forms to record this data have been developed and <br /> implemented. The results will be contained in our next monthly report. <br /> d. Monthly Reporting: Although visual inspections, and readings of effluent <br /> meters have been continuous, data has not been consistently <br /> documented prior to January 2005. We therefore respectfully request the <br /> Page 2 of 3 <br /> S C H ENONE SPECIALTY FOODS , INC . <br /> 18819 East Hwy 88 • P.O. Box 730 • Clements, California 95227 • Phone: (209) 759-3340 • Fax: (209) 759-3350 <br /> Email: info@gourmetchocolate.com • www.gourmetchocolate.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.