My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
3127
>
2900 - Site Mitigation Program
>
PR0515224
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 2:53:10 PM
Creation date
2/12/2020 1:46:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515224
PE
2950
FACILITY_ID
FA0012073
FACILITY_NAME
CURRYS WAREHOUSE
STREET_NUMBER
3127
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14322015
CURRENT_STATUS
01
SITE_LOCATION
3127 E FREMONT ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 June 1999 <br /> AGE-NC Project No. 99-0606 <br /> Page 3 of 7 <br /> Based on evaluation of potential hazards, the following levels of personal protection have been <br /> designated for the applicable work areas or task: <br /> rffReduction <br /> TION' JOB FUNCTION: LEVELS OF PROTECTION: <br /> one Collect samples A B C D Other <br /> one Preserve samples A B C D Other <br /> and log borings <br /> e S=��iupport functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> hard hat <br /> steel-toed boots <br /> Level D: half-faced respirator(if necessary) <br /> gloves <br /> LeEs <br /> safety glasses <br /> If air purifying respirators are authorized, organic vapor and dust is the appropriate canister for use <br /> with the involved substances and concentrations. No down-grading changes of the specified levels <br /> of protection shall be made without the approval of the site safety officer and the project team leader. <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks: <br /> PROJECT TEAM LEADER: TASK: <br /> Tony Mikacich Collect soil anground water samples; <br /> GEOPROBE OPERATOR: TASK: <br /> Advance borings <br /> Field Technician (if nec.) Cleequipment <br /> Ad►-anced CcoEnvironmcntal,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.