Laserfiche WebLink
11. Please include a copy of any studies ( soils , aeology, marketing , <br /> etc . ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERIST= CS <br /> 1. Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . water Supply: Fx i St Wp l l <br /> b. Sewage Disposal : Fy i st SPQ' i r System - N,-w vi th nP4: rP,� i dpn^P <br /> C . Storm Drainage: FXigt to remain <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension( s ) : <br /> d. Natural Gas : N/A <br /> e. Electricity: Pr,;�F - Fxi St _ n _ H _ SPryi rP <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> 11n'Q;;yF41 .Pri vatP RnRd ' - <br /> g . Fire: Trary , Distance to nearest fire station: 2 mile <br /> h . Schools : ' TrPry Srhnol Dist . <br /> 2 . Describe any site alterations which result from the. proposed .pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> No Sionificant Alterations to Site <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Tractors Pickups , Farm EQuipment : No. Unknown , No. Increase <br /> Types of emissions and sources associated with project <br /> Vehicle Emissions Only <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project No Additional <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production: <br /> None <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />