My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
INSTALL_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 11:32:18 PM
Creation date
2/12/2020 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specifications <br /> Designed for Hazardous Location: Siphon Ports: <br /> Class 1,Group D atmospheres 2 available, 1/4" NPT. Vacuums <br /> generated up to 25 in Hg. <br /> Quick-Set Adjustment Range: <br /> RJ 1 =60" -90" Fuel Compatibility: <br /> RJ 2=90" - 150" Diesel <br /> RJ 3= 150" -210" 100% Gasoline <br /> Agency Listing: 80%Gasoline with 20%TAME, ETBE, Just part of the solutions <br /> UL or MTBE offered by the Flow Resource <br /> cUL 0-100% Ethanol at Red Jacket <br /> ATEX Certified 0-100%Methanol We offer a range of solutions,including <br /> leading pump technologies for both <br /> 4" Horsepowers Available: Line Pressure Port: new installations and upgrades, <br /> 1/3 HP,60 HZ, I-phase 1 Available. 1/4" NPT manifolded pumping systems for <br /> p increased uptime and product avail- <br /> 3/4 HP,60 HZ, 1-phase ability, and the industry's leading tank <br /> 3/4 HP, 50 HZ, 1-phase or 3-phase Vent Port: <br /> monitoring and leak detection systems. <br /> 1 1/2 HP,60 HZ, 1-phase 1 Available. 1/4" NPT <br /> 1 1/2 HP, 50 HZ, 1-phase or 3-phase All with the desired purpose of deliv- <br /> X3,60 HZ, 1-phase ering greater profitability and reliability <br /> X4, 50 HZ, 1-phase or 3-phase to our customers. <br /> 2 HP, CPT, 1-phase or 3-phase We are a valuable source of expertise <br /> 2 HP,60 HZ, 1-phase <br /> and information to both site owners <br /> and our business partners. Consider us <br /> your Flow Resource. <br /> Call the Flow Resource today for more <br /> _ information on systems design and <br /> complete product specifications. <br /> t; 800-323-1799 <br /> For inside sales call <br /> 1-888-561-7942 <br /> I► \� 0 2003 Veeder-Root Company 125 Powder Forest Drive • Simsbury,CT 06070 • USA <br /> VEEDER-ROOT <br /> `i Telephone:860-651-2700 • Fax:860-651-2719 • www.veeder.com <br /> P/N 0576047-083 Rev.A VRRS 92003 Printed in USA <br />
The URL can be used to link to this page
Your browser does not support the video tag.