My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
INSTALL_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 11:32:18 PM
Creation date
2/12/2020 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Piping information continued- <br /> Check <br /> Box Code <br /> Section <br /> 25290.1(ox1) Piping compatible with material intended to be stored. <br /> 25290.2(c)(1) <br /> Ll23 CCR Design and construction of piping approved by independent testing organization(e.g.UL). <br /> 2631 <br /> Piping,including vent lines,sloped toward tanks with minimum 1/4 inch sloe per 1 foot of run. <br /> HSC <br /> ® 25290.1(k) <br /> 25290.2C&O) Vapor recovery,fill riser,and vent line piping are secondarily contained. <br /> G. OVERSPILL/OVERFILL PREVENTION: <br /> Check <br /> Box Code <br /> Section <br /> 23 CCR Overspill containment having minimum capacity of 5 gallons provided at each tank fill location. <br /> 2635(b) Manufacturer 0 PLA) Model too - SGL i" <br /> Approved overfill prevention device provided at each tank fill location. <br /> Choose One of the following methods: <br /> ❑ Alert the transfer operator when the tank is 90 percent full by restricting the flow into the tank or <br /> triggering an audible visual alarm <br /> ❑ Restrict delivery of flow to the tank at least 30 minutes before the tank overfills,provided the <br /> restriction occurs when the tank is filled to no more than 95 percent capacity;and activate an audible <br /> 23 CCR alarm at least five minutes before the tank overfills <br /> 2635(bx2) <br /> ❑ Provide positive shut-off flow to the tank when the tank is filled to no more than 95 percent of <br /> capacity. <br /> ❑ Provide positive shut-off of flow to the tank so that none of the fittings located on the top of the <br /> tank are exposed to product due to overfilling. <br /> Manufacturer LAJ Model ( S4 - L' VfL <br /> H. CORROSION PROTECTION: <br /> Check <br /> Box Code <br /> Section <br /> f� Fiberglass reinforced plastic(FRP) <br /> Piping corrosion protection: ❑ Steel with cathodic protection or impressed current <br /> 23 CCR 2636(b) ❑ Steel isolated from contact with backfill <br /> 9 FRP or equivalent non-metallic exterior coatings or coverings <br /> Lj Tank corrosion protection: ❑ Sacrificial Anode <br /> 23 CCR <br /> 2635(ax2) ❑ Steel tank with field installed cathodic protection or impressed <br /> current <br /> ❑ A Tie-downs,when used,constructed of non-corrosive material or coated steel. <br /> -7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.