My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
INSTALL_2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 11:32:18 PM
Creation date
2/12/2020 4:19:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2005
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
99 SHELL*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGRO' "ID STORAGE TANK PROGRAM Fir WORKSHEET <br /> FACILITY NAME FACILITY CONTACT NAME <br /> 1�9 <br /> FACILITY ADDRESS SITE PHONE#WITH AREA CODE <br /> CITY STATE ZIP CODE #OF TANKS AT SITE <br /> CA <br /> APPLICANT BILLING NAME APPLICANT CONTACT NAME <br /> APPLICANT MAILING ADDRESS APPLICANT PHONE#WITH AREA CODE <br /> CITY STATE ZIP CODE CIRCLE WORK TO BE DONE: <br /> Closure Installation Repair Retrofit <br /> ACTIVE FACILITY <br /> 1999 2000 2001 2002 2003 2004 <br /> $500 FEE INCLUDES FACILITY FEE+1 TANK (5170)X(#tanks) <br /> $125 PER TANK AFTER FIRST TANK <br /> $ 7yo. <br /> TANK PENALTY ASSESSED <br /> TANK SURCHARGE=$15/TANK $ y' <br /> STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM=$24.00/FACILITY <br /> PERMANENT CLOSURE <br /> Removal or Permitted Closure in Place <br /> TANK ID#(s): CLOSURE FEE=$279/TANK #TANKS X$279= <br /> TEMPORARY CLOSURE <br /> Plan Review and Inspections) <br /> TANK ID#(s): TEMPORARY CLOSURE FEE_$279/FACILITY <br /> INSTALLATION PLAN CHECK <br /> Plan Check and Construction Inspections) <br /> TANK ID#(s): PLAN CHECK FEE_$744/FACILITY <br /> REPAIR PLAN CHECK <br /> TANK ID#(s): <br /> TANK RETROFIT REPAIR FEE =$279/FACILITY (use for monitoring equipment,spill buckets,tank sumps,misc.) <br /> PIPING REPAIR FEE _$279/FACILITY (use for piping,under-dispenser containment,ect.) <br /> MISCELLANEOUS <br /> TRANSFER FEE _ $20 <br /> CONSULTATION FEE _ $93/HOUR <br /> UNAUTHORIZED RELEASE EVALUATION FEE = $93/HOUR <br /> SAMPLING INSPECTION FEE _ $93/HOUR <br /> ALL FEES ARE BASED ON THE$93 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br /> OFFICE USE ONLY <br /> SERVICE REQUEST# FACILITY ID AMOUNT RECEIVED CHECK# RECEIVED BY DATE RECEIVED <br /> SR <br /> EH 23 032(REVISED 01/22/04) <br />
The URL can be used to link to this page
Your browser does not support the video tag.