C3
<br /> Z
<br /> MATERIAL AND WORKMANSHIP z U x
<br /> OWNER SUPPLIED EQUIPMENT
<br /> I. UNLESS OTHERWISE SPECIFICALLY PROVIDED IN THESE DOCUMENTS, ALL 16. GOVERNING CODES AND STANDARDS INCLUDE, BUT SHALL NOT BE LIMITED B: VENT/VAPOR PIPING: RED THREAD IIA AND RED THREAD If WITH PLEASE REFER `1'O SEPARATE EQUIPMENT LIST. �
<br /> W
<br /> EQUIPMENT, MATERIAL, AND ARTICLES INCORPORATED IN THE WORK TO, THE STANDARDS OF THE FOLLOWING: 1=ITTINCxS AND DS- 000 AND DS-8000 SERIES ADHESIVE, OR AMERON
<br /> % Zrr
<br /> COVERED BY THESE DOCUMENTS ARE t0 BE NEW AND OF THE MOST SUITABLE DUALOY 300®/LCX WITH ALCOHOL FITTlNG�i AND PSX34 ADHESIVE. Z O cil
<br /> GRADE FOR THE PROCESS INTENDED. UNIFORM FIRE CODE (UFC) DO NOT MIX DIFFERENT MANUFACTURER'S MATERIALS. 0 �
<br /> 2. THE CONTRACTOR SHALL m
<br /> AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
<br /> FURNISH tD THE OWNER'S AGENT FOR HIS AMERICAN PETROLEUM INSTITUTE (API) C: PERSONS INSTALLING PIPING MUST BE CERTIFIED AS HAVING BEEN
<br /> Qr y�
<br /> APPROVAL THE NAME OF THE MANUFACTURER, THE MODEL NUMBER, AND AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) TRAINED BY MANUFACTURER
<br /> OTHER IDENTIFYING DATA AND INFORMATION RESPECTING THE UNIFORM BUILDING CODE (USG)
<br /> PERFORMANCE, CAPABILITY, NATURE, AND RATING OF THE MACHINERY AND NATIONAL ELECTRIC CODE (NEC)
<br /> D: STEEL PIPE: ALL METAL PIPING SHALL BE BLACK IRON SCHEDULE
<br /> MECHANICAL AND OTHER EQUIPMENT WHICH THE CONTRACTOR CONTEMPLATES NATIONAL FIRE PROTECTION AGENCY (NFPA) 40, OR EXTRA STRONG. GALVANIZED PIPE 18 NOT ALLOWED. FITTINGS c)
<br /> INCORPORATING IN THE WORK WHEN REQUIRED BY THE OWNER'S AGENT. UNDERWRITE'R'S LABORATORIES, INC. (UL) SHALL BE 300 PSI MALLEABLE IRON. lU
<br /> CALIFORNIA REGULATIONS
<br /> 3. WHEN REQUIRED BY THESE DOCUMENTS OR WHEN CALLED FOR BY THE LOCAL ORD 1NANCE5 E: ALL STEEL PIPE BELOW GRADE IS TO BE DOUBLE WRAPPED WITH 20
<br /> OWNER'S AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR MIL. PVC: PIPE WRAP, OVER A PIPE WRAP PRIMER FOR USE WITH VINYL
<br /> APPROVAL FULL INFORMATION CONCERNING THE MATERIAL OR ARTICLES IT SAFETY PLAN: CONTRACTOR SHALL DEVELOP AND MAINTAIN FOR THE TAPES, AND SHALL BE BY THE SAME MANUFACTURER AS THE WRAP.
<br /> WHICH HE CONTEMPLATES INCORPORATING IN THE WORK. WHEN SO DURATION OF THE CONTRACT A SITE HEALTH 4 SAFETY PLAN THAT WILL
<br /> DIRECTED, SAMPLES MAY BE SUBMITTED FOR APPROVAL AT THE EFFECTIVELY INCORPORATE AND IMPLEMENT REQUIRED SAFETY PROVISIONS, F. ALL THREADED CONNECTIONS SHALL BE THREADED WITH SEALANT
<br /> CONTRACTOR'S EXPENSE, WITH ALL SHIPPING CHARGES PREPAID. AND: WHICH SHALL BE CURRENTLY WARRANTED BY MANUFACTURER FOR FALL
<br /> COMPATI$ILITY WITH THE PIPING MATERIAL USED, AND FOR USE WITH � �
<br /> 4. MACHINERY, EQUIPMENT, MATERIAL, AND ARTICLES INSTALLED OR USED A: APPOINT AND EMPLOYEE AS THE SAFETY OFFICER WHO 15 QUALIFIED PETROLEUM SOLVENTS, FUELS, OILS, DIESEL, AND 1009. METHANOL, WHICH
<br /> WITHOUT REQUIRED APPROVAL SHALL BE AT THE RISK OF SU58EQUENT AND ,AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SHALL BE VERIFIED BY CURRENT MANUFACTURER'S PRODUCT DATA SHEET. Z � � �
<br /> REJECTION. HEALTH AND SAFETY PLAN. SUBMIT THE NAME AND QUALIFICATIONS OF } U X
<br /> THE SAFETY OFFICER TO THE OWNER'S AGENT PRIOR t0 COMMENCING WORK G: G.C. SHALL DEMONSTRATE TO OWNER'S REPRESENTATIVE THAT ALL w O �
<br /> 5. ALL WORK TO BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND ON THE SITE_ MATER4ALS ARE NEW AND CONFORM TO ABOVE SPECIFICATIONS. W W
<br /> REG=ULATIONS. � � � O � � � �
<br /> B. THE PLAN SHALL CONTAIN THE NAMES, ADDRESSES AND TELEPHONE 11. DO NOT PLACE PRODUCT PIPING UNDER BUILDINGS. PIPING RUNS OVER O 73 O o D IL U
<br /> 6. .ALL MATERIALS SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS NUMBERS OF THE SUPERVISORY PERSONNEL, THE HOSPITAL FACILITIES TANKS SHALL BE MINIMIZED_ MAINTAIN MINIMUM CLEARANCE AS REQ'D. BY WCDZ O a
<br /> AND THESE DOCUMENTS. CONFLICTS SHALL BE BROUGHT TO THE ATTENTION NEAREST THE SITE, AND A MAP t0 THE HOSPITAL. PROCEDURES SHALL BE MNFR. MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING T U! E
<br /> OF THE OWNER'S AGENT/ENGINEER- WRITTEN IN T!HE PLAN FOR ACTIONS t0 BE TAKEN SHOULD STRANGE ODORS 15 NOT SHOWN ON SITE PLAN G.C. SHALL RUN LINES THE MOST DIRECT y U
<br /> Owdrm Q) W
<br /> OR HAZARDOUS SUBSTANCES BE UNCOVERED. ROUTE SUBJECT TO APPROVAL BY OWNER'S REPRESENTATIVE. _ m
<br /> �. IF ANY OF THESE DOCUMENTS INDICATE A GONFL f CT WITH THE STATE OR Q�
<br /> LOCAL REQUIREMENTS AS ARE CURRENTLY IN EFFECT AT THE TIME OF THIS C: IF, DURING THE COURSE OF THE WORK, UNSAFE CONDITIONS DEVELOP 12. CONSTRUCT NEW FUEL ISLANDS AS SHOWN ON DRAWINGS. � O q � � ,
<br /> PROJECT, IT 18 EXPECTED THAT THE MOST RESTRICTIVE CONDITION(S) OR ARE ENCOUNTERED, TAKE IMMEDIATE MEASURES TO CORRECT THE 200
<br /> WOULD APPLY. NOTIFY THE ARCHITECT OF ALL CONFLICTS_ CONDITION. IF THE CORRECTIVE ACTION IS INSUFFICIENT IN THE 13, PROVIDE AND INSTALL CONDUIT 4 WIRING FOR PETROLEUM SYSTEM(S) m
<br /> OPINION OF THE OWNER'S AGENT, CONSTRUCTION WORK SHALL CEASE UNTIL AS INDICATED ON THE DRAWINGS. Q
<br /> CORRECTIVE ACTION CAN BE IMPLEMENTED. Q?
<br /> GENERAL CONDITIONS 14. ALL CONDUIT 15 TO BE 3/4", MINIMUM. ul
<br /> N
<br /> D. PROVIDE A MINIMUM OF TWO DIRE EXTINGUISHER'S WITH A MINIMUM Z
<br /> I. CONTRACTOR EMPLOYEES TO HAVE COMPLETED 40 HOURS OSHA TRAINING CLASS RATING OF 2-A,20-5:C WITHIN 50 FEET OF THE OPERATION. 15_ INSTALL MONITORING SYSTEM WITH ANNULAR SPACE PROBES, TURBINE AND LU
<br /> COURSE PRIOR TO THE START OF WORK. CERTIFICATION OF THIS MUST BE DISPENSER SUMP PROBES, TANK GAUGES, ALARMS, AND MONITOR CONTROL
<br /> U
<br /> PROVIDED t0 THE OWNER'S ENGINEER PRIOR TO THE START OF WORK 18. UNDERGROUND SERVICE ALERT (U,SA.) - THE CONTRACTOR SHALL NOTIFY' PANEL IN BUILDING PER DRAWINGS.
<br /> MEMBERS 01= U.5,4- 2 FULL WORKING DAYS IN ADVANCE OF PEwORMING
<br /> 2. CONTRACTOR EMPLOYEES TO HAVE COMPLETED THE PIPING MANUFACTURER'S ANY EXCAVATION WORK BY CALLING THE TOLL-FREE ONE-CALL PROGRAM 16- INSTALL NEW DISPENSERS, AND MISC_ PETROLEUM SYSTEMS, AS INDICATED
<br /> TRAINING REQUIREMENTS IN ACCORDANCE WITH CALIFORNIA UST NUMBER (8010) 22-t-2600. ON PLANS AND DESCRIBED IN THE OWNER'S EQUIPMENT LIST_
<br /> REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO OWNER
<br /> CONTRACTOR SHALL COMPLETE THE PIPING INSTALLATION CHECKLIST 1-1. INSTALL NEW CONCRETE TANK AND DRIVE SLABS AND OTHER CONCRETE AS
<br /> SUPPLIED PIPING MANUFACTURER AND SHALL FURNISH THE CHECKLIST TO PETROLEUM WORK SCOPE INDICATED ON SITE PLAN. CONCRETE SHALL HAVE A MINIMUM
<br /> OWNER COMPRESSIVE STRENGTH AT 28 DAYS OF 2500 PSI, CONCRETE SHALL
<br /> I. PRIOR TO THE START OF WORK, PROVIDE OWNER WITH WORK PLAN AND OTHERWISE COMPLY W/ CONCRETE DESIGN AS SPECIFIED IN CIVIL/ARCH DOCS. L�
<br /> 3. CONTRACTOR TO HAVE BEEN TRAINED AND CERTIFIED BY THE TANK SCHEDULE T11-IAT COORDINATES SCHEDULING WITH OTHER PORTIONS OF G.C. SHALL COORDINATE CONCRETE SLAB WORK W/ PETROLEUM CONTRACTOR tu
<br /> MANUFACTURER IN CORRECT TANK INSTALLATION IN ACCORDANCE WITH THE PROJECT TO THE FULLEST EXTENT POSSIBLE. OR PETROLEUM SUBCONTRACTOR U- -1
<br /> CALIFORNIA UST REGULATIONS. CERTIFICATES SHALL BE PROVIDED TO ILOWNER. CONTRACTOR SHALL COMPLETE THE TANK INSTALLATION CHECKLIST 2. G.C. SHALL FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. POST "KEEP
<br /> SUPPLIED TANK MANUFACTURER AND SHALL FURNISH THE CHECKLIST t0 OUT" SIGNS ON FENCE EVERY 30 FEET. AT THE END OF EACH WORK DAY TESTING
<br /> OWNER. SECURE FENrING PANELS TOGETHER.
<br /> I. ALL TEST€NG SHALL COMPLY WITH MANUFACTURER'S INSTRUCTIONS, TRADE to O
<br /> 4. CONTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK 3. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKS_ STAND:�RDS AND GOVERNING RULES AND CODES, INCLUDING THE USE OF Q d J�
<br /> RK. CERTIFIED AND APPROVED INDEPENDENT THIRD PARTY TESTERS, WHEN U
<br /> INSTALLATION PRIOR TO THE START OF WO
<br /> CONTRACTOR WILL CONDUCT WEEKLY JDB SITE SAFETY MEETINGS WITH IT'S 4 WHEN SOIL IS TO BE STOCKPILED ON SITE FOR SAMPLING PRIOR TO OFF-HAUL, REQUIP'lp"
<br /> EMPLOYEES AND THE MEETING MINUTES WILL BE SUPPLIED To OWNER. CONTRACTOR SHALL PLACE EXCAVATED SOIL ON AND SHALL COVER WITH 4
<br /> MIL. PLASTIC UNTIL SOIL I5 REMOVED, 1N AREA APPROVED BY OWNER / G.C. 2_ FULLY T ST ALL SYSTEMS, AND REPAIR AS NECESSARY. SECURE ALL
<br /> 5_ CONTRACTOR SHALL HAVE THE FOLLOWING LICENSES: REQUIRED TESTS, INSPECTIONS, AND APPROVALS Or- THE COMPLETED
<br /> A. GENERAL ENGINEERING
<br /> 5. GENERAL CONTRACTOR SHALL PROVIDE FOR DISTRIBUTION OF ALL SYSTE"_i. MAKE ALL REQUIRED ADJUSTMENTS AND CORRECTIONS. z
<br /> EXCAVATED SOIL, PER GENERAL PROJECT REQUIREMENTS.
<br /> I-IAz,4RDOU3 MATERIAL SUBSTANCE HANDLING 3. THE PIPING SYSTEM SHALL BE TESTED PER CURRENT MANUFACTURER'S � ff
<br /> i--
<br /> 5. cv �
<br /> INSTRUCTIONS. J O Z
<br /> 6. CONTRACTOR SHALL HAVE THE FOLLOWING INSURANCE. CONTRACTOR SHALL 6- INSTALL "TYPAR" FILTER FABRIC LINER IN TANK HOLE AND TRENCHES, W U 0
<br /> HAVE PROOF OF SUCH INSURANCE ON FILE WITH OWNER BY NAMING OWNER WHERE REQUIRED BY WET-HOLE CONDITIONS. PROVIDE TANK HOLD-DOWNS 4. CONTRACTOR SMALL PROVIDE ENHANCED LEAK DETECTION (E.L.D.) TEST ON _ O
<br /> AS "ADDITIONAL INSURED". AS REQUIRED BY MANUFACTURER IN WET-HOLE CONDITIONS. SYSTEM AFTER PAVING IS COMPLETE AND PRIOR TO FINAL PROJECT U® U
<br /> ACCEPTANCE. TEST SHALL BE CONDUCTED BY A CERTIFIED TESTER. Z
<br /> A. STATUTORY WORKMAN'S COMPREHENSIVE LIABILITY 1. INSTALL TANKS PER DRAWINGS AND CURRENT MANUFACTURER'S INSTRUCTIONS, CONTRACTOR SHALL PROVIDE WRITTEN REPORT OF E.L.D. TEST TO OWNER'S
<br /> WHICH SHALL BE FOLLOWED AT ALL TIMES, AND SHALL HAVE PRECEDENCE REPRESENTATIVE PRIOR TO OWNER'S ACCEPTANCE OF PROJECT. m
<br /> 1:3_ COMPREHENSIVE GENERAL LIABILITY, WITH A COMBINED SINGLE OVER OTHER INSTRUCTIONS. MANUFACTURER'S CHECKLISTS SHALL BE
<br /> LIMIT OF NOT LESS THAN $1,000,000 PER OCCURRENCE FOR BODILY COMPLETED BY THE CONTRACTOR, AS EACH STEP IS COMPLETED. 5. PROVIDE A STATIC PRESSURE (LEAK DECAY) TEST, ACCORDING TO THE BAY O 0
<br /> INJURY AND PROPERTY DAMAGE. TANK BEDDING AND BACKFILL TO BE PEA GRAVEL. TANK BEDDING IS t0 BE AREA AIR QUALITY MANAGEMENT DISTRICT (BAAQMD) MANUAL OF O Z
<br /> A MINIMUM 12"' TANK INTEGRITY TESTING SHALL CONFORM TO MNFR'S. REQS. PROCEDURES, SOURCE TEST PROCEDURE ST-30 OR CARE PROCEDURE
<br /> C. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED HIRED CONTRACTOR SHALL NOTIFY OWNIER'S REPRESENTATIVE TWO WORKING DAYS TP-201. �
<br /> VEHICLES WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY PRIOR TO TANK ARRIVAL. OWNER'S REP. SHALL WITNESS ALL TANK TESTING �r- � d)
<br /> OF NOT LESS THAN $1,000000 PER OCCURRENCE FOR BODILY INJURY AND At HIS/HER DISCRETION. 6. PROVIDE DOCUMENTATION 01= ADYNAMIC BACKPRESSURE TEST OF ALL
<br /> PROPERTY DAMAGE. VAPOR RETURN LINES ACCORDING TO BAAQMD PROCEDURE 5T-2-t OR GARS
<br /> S. PETROL CONTRACTOR TO INSTALL NEW PETROL ELECTRICAL SYSTEMS PER PROCFOURE TP-201, OR AS REQUIRED BY LOCAL REGULATIONS.
<br /> "I. CONTRACTOR TO FURNISH ALL LABOR, MATERIAL, EQUIPMENT, AND PLANS AND PIANUFACTURER'S REQUIREMENTS. ARRANGE FOR ALL
<br /> SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE INSPECTIONS. PROVIDE CONDUITS/WIRING, J-BOXES, ETC. REQUIRED FOR -1. PROVIDE LIQUID REMOVAL TEST FOR BALANCE SYSTEMS (GASOLINE) WITH A
<br /> SATISFACTORY COMPLETION OF ALL WORK SHOWN ON, CALLED FOR, OR COMPLETE ELECTRICAL SYSTEMS_ LIQUID REMOVAL DEVICE REQUIRED BY A CARR EXECUTIVE ORDER, IF MORE
<br /> REQUIRED BY THE DRAWINGS, EXCEPT AS NOTED BY OTHERS. THAN 100 ML OF LIQUID IS FOUND IN THE VAPOR PATH. TH15 SHALL BE
<br /> 9. INSTALL EQUIPMENT AS LISTED IN OWNER'S EQUIPMENT LEST AND PROVIDE DETERMINED BY LOWERING THE GASOLINE DISPENSING NOZZLE INTO A
<br /> 8. ALL WORK SHALL 13E PERFORMED IN ACCORDANCE WITH THE UNIFORM AND INSTALL ALL Ot{-ISR EQUIPMENT ,4S REQUIRED t0 PROVIDE A CONTAINER AND DRAINING ALL LIQUID, THEN MEASURING THE AMOUNT OF
<br /> 15UILDING CODE, UNIFORM FIRE CODE, NATIONAL ELECTRICAL GODS, COMPLETE PETROLEUM SYSTEM. LIQUID USING A GRADUATED CYLINDER OR BEAKER IF REQUIRED, THE
<br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS, OSHA LIQUID REMOVAL TEST SHALL BE CONDUCTED AND PASSED ACCORDING TO
<br /> CONSTRUCTION SAFETY ORDERS, C.A.R.B. EXECUTIVE ORDERS GUIDANCE LETTERS, 10. PROVIDE AND INSTALL NEW PRODUCT, VENT, VAPOR, AND SECONDARY CARS TEST PROCEDURE TP-201_ �, r
<br /> AND ANY OTHER APPLICABLE STATE, CITY, OR COUNTY ORDINANCES. CONTAINMENT LINES PER DRAWINGS. CURRENT MANUFACTURER'S
<br /> INSTRUCTIONS SHALL BE FOLLOWED AT ALL 'TIMES, AND SHALL HAVE B. PROVIDE STATIC TORQUE TEST OF ROTATABLE PHASE f VAPOR ADAPTERS (f
<br /> S. ALL PERMITS TO BE SECURED BY OWNER OR OWNER'S AGENT AND SUPPLIED TO PRECEDENCE OVER OTHER INSTRUCTIONS_ MANUFACTURER'S CHECKLISTS ACCORDING TO CARD PROCEDURE TP-201.
<br /> CONTRACTOR, WHO IS RESPONSIBLE FOR COMPLYING WITH ALL PERMIT SHALL BE COMPLETED BY THE CONTRACTOR, AS EACH STEP 18 COMPLETED.
<br /> CONDITIONS. A: PRODUCT PIPING: PRIMARY PIPING WITH CONTAINMENT SYSTEM `l PROVIDE LEAK RATE TEST OF OVERFILL PREVENTION DEVICE ACCORDING TO fu
<br /> GARB PROCEDURE TP-201.
<br /> 10. CONTRACTOR SHALL V151T SITE AND FAMILIARIZE HIMSELF OF RED THREAD IIA AND RED THREAD 11 WITH FITTINGS AND
<br /> ALL EXISTING CONDITIONS PRIOR TO SUBMITTING HIS BID. DS-71000 AND DS-8000 SERIES ADHESIVE, OR AMERON DUALOY 10. PROVIDE LEAK RATE TEST OF PRESSURE/VACUUM VENT VALVES ACCORDING Q
<br /> 3000/LCX W1714 ALCOHOL FITTINGS AND PSX.34 ADHESIVE. DO NOT MIX TO CARS PROCEDURE TP-201.
<br /> 11. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES TO DIFFERENT MANUFACTURER'S MATERIALS. ALL PIPING AND CONTAINMENT
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SHALL REPAIR OR SYSTEMS SHALL BE UL APPROVED FOR 100% METHANOL. CONTAINMENT 11. PROVIDE ALL OTHER TESTING AS REQUIRED BY STATE AND LOCAL
<br /> REPLACE TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE ANY SYSTEM SHALL BE BY THE SAME MANUFACTURER, WITH THE SAME SERIES REGULATIONS, MANUFACTURER REQUIREMENTS, AUTHORITIES TO CONSTRUCT, u �� o
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S ADHESIVES AND/OR FITTINGS. EXECUTIVE ORDERS AND APPROVAL LETTERS, INCLUDING REQUIREMENTS OF _. QwL�
<br /> OPERATIONS. VERIFICATION AND REVERIFICATION TESTING AFTER SYSTEM OPERATION w uifL
<br /> BEGINS. LL�wuj N w o 10:° v
<br /> 12. ALL EXCAVATIONS SHALL BE PERFORMED IN COMPLIANCE WITH OSHA AND N� '�w 0�w�ill w �
<br /> J Z an ��19pw00 0
<br /> STATE REGULATIONS. � ®
<br /> a �
<br /> 13. UPON COMPLETION OF PROJECT, CONTRACTOR SHALL PROVIDE OWNER WITH
<br /> "AS BUILT" DRAWINGS OF ALL ITEMS INSTALLED BY SAME. "AS GUILTS" F- o
<br /> SHALL BE COMPLETED ON-SITE WITH INFORMATION NOTED DIRECTLY ON � W �
<br /> z z� �wl
<br /> APPROVED JOB COPY. LU Z Q a d o
<br /> 14, CONTRACTOR SHALL PROVIDE A LIST OF SUB-CONTRACTORS, IF ANY, WHO W Z m o , o o
<br /> WILL BE USED ON THE PROJECT. nJL
<br /> lu :z7�Z'-�u�i�z U
<br /> 15. CONTRACTOR SHALL COORDINATE ALL INSPECTIONS AND APPROVALS AND �,� ARc� 3
<br /> OBTAIN, AT THE COMPLETION OF THE PROJECT, ALL CERTIFICATES
<br /> REQUIRED TO RUN THE FACILITY. w fy o