My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
1444
>
3500 - Local Oversight Program
>
PR0545372
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 5:16:03 AM
Creation date
2/13/2020 9:36:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545372
PE
3528
FACILITY_ID
FA0003871
FACILITY_NAME
UPS Freight - Lathrop
STREET_NUMBER
1444
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
1444 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NES!Tit <br /> C EgVIC <br /> 1I <br /> CONDOR EARTH TECHNOLOGIES INC. <br /> 1125 No. Golden State Blvd. 21663 Brian Lane <br /> Suite H P.O. Box 3905 <br /> PO. Box 3448 Sonora, CA 95370 ` <br /> March 3, 1995 Turlock, CA 95381 (209)532-0361 f <br /> (209)668-9234 FAX(209)532-0773 <br /> Mr. Steve Sasson FAX (209)668.9248 <br /> San Joaquin County Public Health Services <br /> I <br /> Environmental Health Department ' <br /> P.O. Box 388 <br /> Stockton, CA 95201-0388 <br /> RE: Di Salvo Trucking Facility located at 1444 Lathrop Road in Lathrop, California <br /> SUBJECT: Request for Extension to'.March 1, 1995, Deadline to Begin Drilling <br /> Dear Mr. Sasson; <br /> This Ietter is to confirm our telephone conversation n February 27, 1995, in which you gave verbal <br /> approval to analyze the soil samples to be collected from the above referenced site as proposed in the <br /> September 27, 1994, work plan prepared by Condor Earth Technologies, Inc., (Condor). Condor proposed <br /> analyzing the soil samples collected from the above.referenced site for Total Petroleum Hydrocarbons as diesel <br /> (TPH-d) by method 3550/LUFT. Additionally, this letter is to elaborate on Condor's request, on behalf of Di <br /> Salvo Trucking, for an extension to the March 1, 1995, deadline to begin drilling at the site. <br /> Currently, Di Salvo Trucking is involved with a soil and/or groundwater investigation at the above <br /> referenced site and at 100 South Ventura Avenue in Stockto i, California. To the best of my knowledge, Mr. <br /> J. <br /> Tounger of Di Salvo Trucking, is responsible for overseeing the environmental investigations located at both <br /> sites, in addition to managing the Di Salvo trucking fleet. At present, the Ventura Avenue site is receiving a <br /> majority of Mr. Tounger's attention because of a real estate ransaction affected by the investigation of soil <br /> contamination associated with two former diesel undergroun storage tanks formerly located at the site. <br /> Therefore, to allow Mr. Tounger the time to focus on the Ventura Avenue site, Condor requests, on behalf of <br /> Di Salvo Trucking, an extension to the March 1, 1995, deadline to begin drilling at the site. The requested <br /> extension is for sixty (60) days from the previous March 1, 1995, deadline. <br /> At your earliest convenience, please provide written concurrence of the requested extension for <br /> beginning drilling at the Di Salvo Trucking Facility. A con urrence statement and a stamped, self-addressed <br /> ENVIRONMENTAL GEOLOGICAL ENGINEERING GEOTECHNICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.