Laserfiche WebLink
C i <br /> F♦ <br /> l Subsurface Investigation, Well Installation, and Sample Analyses Results Page 2 <br /> Cintra Park Phase II Development, <br /> Tract 2705, Tracy, California <br /> July 23, 1998 CTE Job No. 20-0445B <br /> to the development from Corral Hollow Road is via Velasques Lane to Lara Court. The site is <br /> 1 <br /> at the north side of the Lara Court cul-de-sac (Figure 2). <br /> Land use in the site's vicinity generally consists of single-family residences and agricultural space. <br /> �- However, this area has recently undergone a rapid build out and conversion from agricultural to <br /> residential uses. <br /> The Cintra Park Phase II development consists of the construction of single-family residences and <br /> is <br /> associated improvements including streets, utilities, and landscaping. To create the development, <br /> € . final elevation of site area is now raised approximately five feet above the previous surface grade. <br /> 2.2 Responsible P Contact <br /> The responsible party contact is: Mr. Michael Gallagher <br /> Tri-Star Homes <br /> P.O. Box 1056 <br /> Alamo, California 94507-1914 <br /> 2.3 Geomorphology, Geology, and Hydrogeolo�y <br /> 2.3.1 Geomorphology <br /> The site lies in the northern end of the San Joaquin Valley, a structural and topographic basin <br /> comprising the southern half of the Great Valley Geomorphic Province of California. In the area of <br /> CATEEL FILESUNTRA PARKICINTRA7-13.D0C <br /> 4 . <br />