Laserfiche WebLink
ti <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) 490-1. <br /> ITYPEOFACTION NEW PLAN ❑ 2-CHANGE OF INFORMATION <br /> 491>-z. <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item onhv) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use <br /> Only _ _ <br /> 3. <br /> BUSINESS NAME(Same as Facilily Nante or DBA) <br /> 103. CI'T'Y 104. <br /> BUSINESS SITE ADDRESS r- 1 � f����-evl C (1- c- <br /> 11. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more uen_t_S_uch work must be performed qualified personnel Iz3 cCR§2632_'A34.2619.26411 <br /> _ 490-3& <br /> MONITORING EQUIPMENT IS SERVICED ANNUALLY ❑ 99.OTHER(Specify): 490-3b. <br /> M. MONITORINATIONS <br /> 490-4. <br /> ❑ 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED 123 CCR§3632 26341 <br /> (Check all <br /> . TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that apply) <br /> CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTE ITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.ID CCR§2632.26341 490 6 <br /> SECONDARY CONTAINMENT IS: a.DIV,( r b.LIQ ID FILLED El c.PRESSURIZED ❑ d UNDER VACUUM <br /> C 490-7. MODEL#: T fiS` 3 ��/ 9040. <br /> PANEL MANUFACTURER: V <br /> C 490-9. MODEL#(S)_ 490-10. <br /> _ LEAK SENSOR MANUFACTURER: Li <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).123 CCR§26431 4 " <br /> PANEL MANUFACTURER: 490-1i MODEL#_ 490-13. <br /> IN-TANK PROBE MANUFACTURER: 49°x4. MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ <br /> c.WEEKLY 490-16. <br /> 490-x7. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): <br /> 490-19. <br /> _ PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19. <br /> 490-20. <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR§2644.11 <br /> 490-21. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)123 CCR§26451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS _490-21 <br /> 490-23. <br /> ❑ 5.TANK INTEGRITY TESTING PER 123 CCR§2643.11 490-24 <br /> TEST FREQUENCY: _ ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 49x25._ <br /> 490-26. <br /> 490-27. <br /> ❑ <br /> 99.OTHER(Specify): (Check aU <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) that apply) <br /> 1_CONTINUOUS MONITORING OF PIPE/PIPWG SU AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&' I ALARMS. 590-2R. <br /> 123 CCR SECONDARY CONTAINMENT IS: _ .LIQ 2D FILLED ❑ c.PRESSURIZED UNDER VACUUM 490-29 <br /> §26361 t (\ � '_ 31 __Z 490-31. <br /> PANEL MANUFACTURER: V � ✓ A F 490-30. MODEL#: <br /> 41 <br /> LEAK SENSOR MANUFACTURERI 90-32 MODEL#(S): J33. <br /> : /490-34 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ES b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ES ❑ b.NO <br /> 490-35. <br /> [12.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-36. <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.I23 CCR§'6361 490-3& <br /> 490'37. MODEL#(S): <br /> _ MLCD MANUFACTURER(S): -490-3 3.9 <br /> LECTRONIC A LINE LEAK DETECTOR(ELLD 00 1 ELY PEKFO� 1 (RMM 3 0 g.p.h.LEAK TESTS_1'-3 ccR§26361 _ _ <br /> ELLD MANUFACTURER(S): 7-o-+� 49' MODEL#(S): �? � <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINI M MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. M-9-YES ES ❑ b.NO 4 3' <br /> ELLD FA[LURFIDISCONNECT[ON TRIGGERS AUTO TIC PUMP SHUTDOWN. ES ❑ b.NO 490-14 <br /> -_-_ _. 490-05. <br /> ❑ 4.PIPE INTEGRITY TESTING. <br /> 490-16. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490 4z__- <br /> _ 490-i9. <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED' 490-09- <br /> •AUowed of inbiaitd epeatorCue1�Po8 adv er_HSC ?81.5@)«... _ <br /> ---- 490-50. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA_123 CCR§2636(,x3)1 - <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. 490-51. <br /> 490-52 <br /> ❑ <br /> 99.OTHER(Specify) 490-53. <br /> UPCF UST-D(12/2007)-1/4 N'ww.unMas.org <br />