My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:11:40 AM
Creation date
2/13/2020 9:53:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL H ALTH .DEPARTMENT <br /> PaU'" SAN JOAQU N COUNTY <br /> Donna K. Heran R.E.H.S. <br /> Unit Supervisors <br /> <' Director 304 East Weber AN enue,Third Floor Carl Borgman,R.E.H.S. <br /> Laurie A. Cotulla, R.E.H.S. Stockton,California 95202-2708 Mike Huggins, R.E.H.S., R.D.I. <br /> -:. P Program Manager Douglas W.Wilson, R.E.H.S. <br /> Q�1F'w Telephone: (209)468-3420 <br /> Margaret Lagorio,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClellon, R.E.H.S. <br /> Website:www.sjgov.org/ehd/ Jeff Carruesco,R.E.H.S. <br /> ERNEST J POMBO JR MAR 2 8 2006 <br /> 1755 W 11TH STREET <br /> TRACY CA 95376 <br /> RE: POmbo Ranch Property SITE CODE: 508110. <br /> 24100 Lammers Road <br /> Tracy CA 95376 <br /> San Joaquin County Environmental Health. Department (SJC/EHD) has reviewed. <br /> Quarterly Groundwater Sampling Report, First QuaHer 2006 dated January 2006, <br /> prepared on.your behalf. by M.J..Kloberdanz & Associates and has the following <br /> comments. <br /> A remediation of contaminated soil was conducted I at your site during. February.2005. <br /> Petroleum hydrocarbon contaminated soil was excavated from the location of two former <br /> underground storage tanks and hauled offsite for di 3posal. Four routine quarterly <br /> groundwater monitoring and sampling events have :)een completed since.the.remedial <br /> action.took place. Analytical results indicate remov I of the source of the.contamination <br /> has had a positive effect on the groundwater contamination. Current analytical results <br /> from the wells at this site that have had detections of contamination in the past are either <br /> non-detect or an order of magnitude lower than they.were before the.remediation.. <br /> Please have your consultant prepare a closure repc rt for this site following the. Regional <br /> Water Quality Control. Board Tri-Regional. Guideline 3, Appendix A. Include in the report <br /> an.estimate of contaminant mass remaining at the site, in both soil and groundwater. In <br /> addition, please. include a calculation of the total arr ount of soil removed from the.site. <br /> during the excavation. The.Remedial Excavation & Source Removal Report, dated <br /> April 13, 2005.did.not state the total quantity.of impacted soil removed from the.site for <br /> disposal. Estimated lateral dimensions of the excavation were.stated, but the depth of <br /> impacted.soil is. not clear. . Part of the excavation area had approximately 5.feet of clean <br /> overburden, part had.8 feet. Clean overburden soil as stored onsite and used to backfill <br /> the excavation. Total depth of the excavation was 12 feet below surface grade (bsg), <br /> indicating, therefore, that the vertical extent of contaminated soil ranged from 4-7 feet. <br /> Using the worst case scenario of 7 feet of impacted soil, and the approximate.dimensions <br /> of the excavation area stated. in the excavation repo , an estimated 1,000 cubic yards of <br /> soil would have been hauled for disposal. The Disposal Activity Report submitted from <br /> the landfill states that 2,880 yards of soil were received and that it weighed 1524.71 tons. <br /> Some of the.soil received was classified as Class 11 3oil and some was classified as <br /> Environmental Class II soil. Please explain this information and provide a final estimate of <br /> the total volume of contaminated soil removed from he site, and a calculation of the <br /> contaminant mass contained in that soil. <br />
The URL can be used to link to this page
Your browser does not support the video tag.