My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� <br /> P.O. Box 576981 <br /> M.J. Kloberdanz & Associates Modesto, California 95357-6981 <br /> Environmental Services Phone: (209)577-8186 <br /> Fax: (209) 577-8158 <br /> March 24, 2005 <br /> Ms. Lori Duncan, REHS <br /> San Joaquin County Environmental Health �������� <br /> 304 E. Weber Ave., Third Floor <br /> Stockton, California 95202 <br /> kA; �i i. 7005 <br /> Addendum to December 10, 2002 WORK PLAN 1»NWUNNIENl HEALTH <br /> Monitoring Well replacement, Pombo Ranch Property, PE-ri f IT/SERV10ES <br /> 24100 S. Lammers Road, Tracy, California <br /> Monitoring Well MW-4 was located within the remedial excavation area at the above <br /> referenced facility and removed earlier this moni h in order to capture a greater amount of <br /> the soil contamination that is leaching into the oundwater. According to the letter of <br /> November 3, 2004, and conversations with SJEED since the excavation, MW-4 will need <br /> to be replaced outside of the excavated area with the same approximate baring from the <br /> source(attached Figure). <br /> M.J. Kloberdanz & Associates proposes to insta 1 the well as soon as all stockpiled soils <br /> have been removed (April). The well will be constructed according to the standards <br /> described in our original work plan of December 10, 2002. <br /> Please consider this letter an addendum to our revious work plan. A drilling date of <br /> April 13, 2005 has been reserved and confirtno tion will be made the week before. A <br /> report of the excavation activities will be submi ted as soon as all of the stockpiled soil <br /> has been removed. Do not hesitate to call if you ave questions. <br /> Sincerely, <br /> Michael J. Kloberdanz <br /> Cc: Ernest Pombo <br />
The URL can be used to link to this page
Your browser does not support the video tag.