My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 4:07:36 AM
Creation date
2/13/2020 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M.J. Kloberdanz & Associates <br /> Health & Safety Plan <br /> 1.0 HEALTH AND SAFETY PLAN <br /> M.J.Kloberdanz&Associates has adopted the following health ard safety procedures for working with organic vapors <br /> and liquid contaminants encountered during drilling and excavation of subsurface soil. The purpose of this program is <br /> to provide health and safety precautions for the initial and subseq jent site visits until the nature and magnitude of the <br /> contaminants have been defined. <br /> 1.1 Personnel Responsibilities <br /> Ali personnel assigned or involved with the remedial investigation or site clean ups will have an assigned <br /> responsibility. The outlined responsibilities will establ sh standards for personnel protective wear, safety <br /> procedures and provide for emergency actions which could arise during project operations. <br /> 1.2 Project Manager(PM) <br /> The Project Manager directs all project operations. Pro ect Manager (PM), in cooperation with the Project <br /> Safety Officer(PSO),has the primary responsibility for ensuring that the safety plan is read,signed,and fully <br /> understood by all employees and outside persons allowed around or within designated working perimeters of <br /> the job site. <br /> In cooperation with the PSO, he is responsible for ens ring that at all times during project operations, all <br /> employees adhere strictly to the Health and Safety Plan. <br /> 1.3 Project Safety Officer(PSO) <br /> The PSO shall direct and ensure that all employees comr ly with the Health and Safety Plan,The PSO has the <br /> primary responsibility for: <br /> 1. Assuring that appropriate personnel protectivc equipment is available and properly utilized by all <br /> on-site personnel. <br /> 2. Assuring that personnel are aware of the provi ions of this plan,are instructed in the work practices <br /> necessary to ensure safety,and in planned procedures for dealing with emergencies. <br /> 3. Assuring that personnel are aware of the potent ial hazards associated with site operations. <br /> 4. Monitoring the safety performance of all peri nnel to ensure that the required work practices are <br /> employed. <br /> 5. Correcting any work practices or conditions hat may result in injury or exposure to hazardous <br /> substances. <br /> 6. Preparing any accident/incident reports(see att ched Accident Report Form). <br /> 1.4 Project Employee <br /> Project Employees involved in on-site investigations are 7esponsible for: <br /> 1. Taking all reasonable precautions to prevent in ury to themselves and to their fellow employees. <br /> 2. Implementing Health and Safety Program and reporting to the PSO for any action deviating from <br /> the anticipated conditions described in the Hea th and Safety Plan. <br /> 1.5 Special Instructions <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.