Laserfiche WebLink
V , <br />' Table 5 <br /> Estimated Mitigation Costs <br /> 1 Low Risk Closure <br /> Domesti <br /> Well Monitoring 1500 1500 <br /> 1500 <br /> 1 Contaminated Soil Excavation and Treatment <br /> Volume of Soil Excavate cu ft 53,900 cu yd 1996.296 <br /> ' Contaminated Soil cu ft 13,475 cu yd 499.0741 <br /> ' Remove Pavement per sq. ft 0.5 5,390 2695 <br /> Replace Pavement per sq. ft 1 5,390 5390 <br /> ' Excav f Seg Soil cu yd 5 2000 10000 <br /> Replacement Soil cu yd 2 500 1000 <br /> Compaction cu yd 1 2000 2000 <br /> ' Stock Pile Characterization 15 100 1500 <br /> Consulting Costs Excavation 1 tre 2000 4 8000 <br /> Land Farming 500 cu yd 5000 <br /> lie Monitoring 3000 4 12000 <br /> 47585 <br /> Enhanced Aerobic Insitu Bioremediation <br /> 1 Slurry Injection <br /> Hydropunch Injection/4 borings 5000 4 (16 borings) 20000 <br /> ORC Material 15000 <br /> ' <br /> Monitoring 3000 4 12000 <br /> 47000 <br /> Contaminated Soil Excavation and Treatment with ORC Excavation Infill <br /> ' Contaminated Soil Excavation and Treatment 35585 <br /> ORC Material 16,000 <br /> Compaction cu yd 1 2000 2000 <br /> ' Monitoring 3000 4 12000 <br /> 65,585 <br /> Cost Comparison <br /> ' Low Risk Closure 1,500 <br /> Source Removal 47,585 I <br /> 1 Aerobic Bioremedation 47,000 <br /> Source Removal 1 Aerobic Bioremedation 65,585 <br /> 'i <br /> 1 . <br /> 1 <br />