My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
3000 – Underground Injection Control Program
>
PR0515446
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:29:48 PM
Creation date
2/13/2020 11:26:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515446
PE
3030
FACILITY_ID
FA0012150
FACILITY_NAME
NAVAL COMPUTER TELECOMMUNICATIONS
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
305 FYFFE AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4yMr TaoIirh WEST CODE 184 N0, 9 75 P.P. <br /> CLOSURE Rp UUUTAZltiTTS (Continued) <br /> Feet by Rule Futilities <br /> Cksute Plan: A written plan is required, and must be maintaimW at the <br /> finality. The plate must be am xled at least 60 days prior <br /> to any proposed change► of no User than 60 days after an <br /> unexpected vveW has oMMITd whist has afteMd the <br /> clostrre plan. The owtiWopemtor sW amend the clestm <br /> plan whenever: <br /> A) changes is operating plans or facility&sip <br /> affect etre closure plant, <br /> B) here is a change is the vpp cted yaar of <br /> ClPsura, <br /> C) in conducting partial or final closure <br /> actividcs, tmexpected evenu require a <br /> modification of the closure plan. <br /> Ckm= FinancW Assurance: <br /> Required by January 1, 1995 <br /> Ciasure Nodficar on: The facility nwnerlopcwnr must notify the Dopar nmt and <br /> any other agency having jurMictioa ovm- the fiaity, at <br /> [east 15 days prior to completion of closure. <br /> Closure CertifiCadon_ Cenificatian that the tmil(s)haslhuve=t the DGpatirttcnt's <br /> require. encs for Closum must be signed be else owner or <br /> operator Ind by an independent, professional engineer <br /> rt giSVad in Ulforaia. <br /> aosure Deadlines: YINILKAUS aftcl't wfing tele final volumt of hazardous <br /> waste the unit owner or opmtor shall treat, MIXwe from <br /> the facility or dispose of on-site, all h=rdous •wasic in <br /> accordance with the closure plan and applitabje <br /> rcgtrzrt:mGAts. <br /> yV lWa 180 days after treating the final volume of <br /> haUrdous waste the closure must be completed,, <br /> The owner or operator mast notify the Deganmenx and any <br /> other ttmencies having jurisdiction aver the clow r project <br /> at least 11 daX3 prior to compltdon of closure. <br /> OMTX TRFATw-K UMT CL051n CmDAKg(W PACt 3 <br /> __ b0 'd 60VO M He 'ON XVA 0d,1NIMCNIAM Ofd ZI:H M 86-LI-OIQ <br />
The URL can be used to link to this page
Your browser does not support the video tag.