Laserfiche WebLink
AGS <br /> qualification. The specific USEPA Methods and Standard Methods to be used far this <br /> project are described in Section 3.3 of the Work Plan and repeated below. <br /> 3.0 FIELD ANALYTICAL QA/QC ACTIVITIES <br /> Field QA/QC samples will be collected in accordance with the following procedures. <br /> 3.1 Soil Borings <br /> A total of 15 primary soil samples are planned to be collected from the soil borings for <br /> chemical analysis. Three duplicate soil samples will also be collected. one from each <br /> OWS site. Primary and duplicate soil samples will be analyzed for the following <br /> constituents: <br /> • TPH-D/MO by EPA 8015 (mod.); <br /> • TPH-G/BTEX by EPA 8015 (mod.)/8020; <br /> • VOCs and oxygenate compounds by EPA 8260; <br /> • CAM 17 metals by EPA 6010/7000: <br /> • PCBs by EPA 8082; and <br /> • SVOCs by EPA 8270. <br /> Two trip blank (water) samples will accompany the soil samples in the coolers and be <br /> analyzed for VOCs. All samples analyzed for TPH-D/MO will be subjected to silica gel <br /> cleanup process prior to analysis to remove water soluble, vegetable-basas oi.►s from <br /> the samples. <br /> 3.2 Soil Boring Grab Groundwater Samples <br /> A total of 21 grab groundwater samples will be collected. In addition. three duplicate <br /> grab groundwater samples will be collected, one from each OWS site. Primary and <br /> duplicate samples will be analyzed for the same constituents and methods listed above <br /> for the soil samples. Two trip blank (water) samples will accompany the grab <br /> groundwater samples in the coolers and be analyzed for VOCs. <br /> LAURA\C1Wpu,,ino0\WPDOCS\95CLTS\1995\9503040,WorkPlan.gappdoc D-2 :8;199 <br />