My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
3000 – Underground Injection Control Program
>
PR0515446
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:29:48 PM
Creation date
2/13/2020 11:26:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515446
PE
3030
FACILITY_ID
FA0012150
FACILITY_NAME
NAVAL COMPUTER TELECOMMUNICATIONS
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
305 FYFFE AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGS <br /> qualification. The specific USEPA Methods and Standard Methods to be used far this <br /> project are described in Section 3.3 of the Work Plan and repeated below. <br /> 3.0 FIELD ANALYTICAL QA/QC ACTIVITIES <br /> Field QA/QC samples will be collected in accordance with the following procedures. <br /> 3.1 Soil Borings <br /> A total of 15 primary soil samples are planned to be collected from the soil borings for <br /> chemical analysis. Three duplicate soil samples will also be collected. one from each <br /> OWS site. Primary and duplicate soil samples will be analyzed for the following <br /> constituents: <br /> • TPH-D/MO by EPA 8015 (mod.); <br /> • TPH-G/BTEX by EPA 8015 (mod.)/8020; <br /> • VOCs and oxygenate compounds by EPA 8260; <br /> • CAM 17 metals by EPA 6010/7000: <br /> • PCBs by EPA 8082; and <br /> • SVOCs by EPA 8270. <br /> Two trip blank (water) samples will accompany the soil samples in the coolers and be <br /> analyzed for VOCs. All samples analyzed for TPH-D/MO will be subjected to silica gel <br /> cleanup process prior to analysis to remove water soluble, vegetable-basas oi.►s from <br /> the samples. <br /> 3.2 Soil Boring Grab Groundwater Samples <br /> A total of 21 grab groundwater samples will be collected. In addition. three duplicate <br /> grab groundwater samples will be collected, one from each OWS site. Primary and <br /> duplicate samples will be analyzed for the same constituents and methods listed above <br /> for the soil samples. Two trip blank (water) samples will accompany the grab <br /> groundwater samples in the coolers and be analyzed for VOCs. <br /> LAURA\C1Wpu,,ino0\WPDOCS\95CLTS\1995\9503040,WorkPlan.gappdoc D-2 :8;199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.