My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:17:53 PM
Creation date
2/13/2020 11:49:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s . <br /> Page 2 of 2 <br /> Soil Gas Probes Permit Application(SV1—SV3) <br /> January 13,2011 (Revised January 21,2011) <br /> or fitted with a vapor inlet filter. Once the tubing is in place, clean sand will be poured around the perforated <br /> section of the tubing. The annulus will be filled with 1 foot of dry bentonite chips and then filled to ground surface <br /> with hydrated bentonite chips to create a seal. Soil gas probe construction is shown in Figure 4. <br /> Sotq Gas Sample Handling Procedures <br /> mmediately at a mobile laboratory. The glass syringes will be kept in a <br /> Soil gas samples collected will be analyzed i <br /> cool dark place at all times. The samples will be wrapped in foil and kept in an insulated container till the samples <br /> are analyzed. The samples will not be subjected to extreme hot or cold temperatures. If condensation is observed, <br /> then the sample will be discarded and new sample collected. <br /> .x�i Duplicate Sampling <br /> The results of the field work utilizing a mobile laboratory will be independently confirmed through the collection <br /> of one duplicate soil gas sample in a 250 ml SutmnaTM canister. This duplicate sample will be analyzed using EPA <br /> Method 8260 in an off-site State-certified Environmental laboratory. The duplicate sample will be collected in an <br /> area where soil gas is suspected to be impacted with VOCs. <br /> Accordingly,Please find enclosed the following items for the above-referenced project: <br /> A copy of the completed permit application for APN#21220008(subject site) " <br /> Acopy of the Well Construction diagram Human HealthltiskAssessment Workplan. <br /> • Acopy of AA&A s Soil Gas Sampling and <br /> • <br /> A copy of the corresponding SJCDEH Approval Letter. <br /> • A check in the amount of$488.00(made out to the San Joaquin County EHD)to cover the permit fees. <br /> Please don't hesitate to contact the undersigned should you have any questions or require anything further. <br /> Sincerely, <br /> Larry Witwer <br /> Sr.Project Manager <br /> Ami Adini&Associates,Inc. <br /> Phone:323-913-4073 <br /> Fax:323-667-2336 <br /> Email:laM fa)amlachm com <br /> Enclosures <br /> Amo Adtn{ <br /> �L&A oGitFc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.