Laserfiche WebLink
A • • <br /> Soil Gas Probes Permit Application(SV1—SV3) Page 2 of 2 <br /> January 6,2011 <br /> inlet filter. Once the tubing is in place, clean sand will be poured around the perforated section of the tubing. The <br /> annulus will be filled with I foot of dry bentonite chips and then filled to ground surface with hydrated bentonite <br /> chips to create a seal. Soil gas probe construction is shown in Figure 4. <br /> Soil Gas Sample Handling Procedures <br /> Soil gas samples collected will be analyzed immediately at a mobile laboratory. The glass syringes will be kept in a <br /> cool dark place at all times.The samples will be wrapped in foil and kept in an insulated container till the samples are <br /> analyzed. The samples will not be subjected to extreme hot or cold temperatures. If condensation is observed, then <br /> the sample will be discarded and new sample collected. <br /> Accordingly,Please find enclosed the following items for the above-referenced project: <br /> • A copy of the completed permit application for APN#21220008(subject site). <br /> • A copy of the Well Construction diagram&Site Map. <br /> • A copy of AA&.A s Soil Gas Sampling and Human Health RiskAssessment Workplan. <br /> • A copy of the corresponding SJCDEH Approval Letter. <br /> • A check in the amount of$488.00(made out to the San Joaquin County EHD)to cover the permit fees. <br /> Please don't hesitate to contact the undersigned should you have any questions or require anything further. <br /> Sincerely, <br /> 3 f <br /> Larry Witwer <br /> Sr.Project Manager <br /> Ami Adini&Associates,Inc. <br /> Phone:323-9134073 <br /> Fax:323-667-2336 <br /> Email:Iarrvw(a),amiadini.com <br /> Enclosures <br /> XAmi Adini <br /> &Ass iat•s,rnc. <br />