My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:17:53 PM
Creation date
2/13/2020 11:49:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dear Ms • Page 6 of 7 <br /> 5. Additional well is required down-gradient, offsite, to evaluate risk of <br /> MTBE migration to sensitive receptors. <br /> 6. Sampling of domestic wells downgradient from the site is required as <br /> soon as possible to evaluate the risk of MTBE migration to these areas. <br /> 7. The 2009 4th quarter groundwater monitoring episode is overdue. <br /> 8. AA&A to provide timetable for carrying out the above decisions. <br /> TIMETABLE: <br /> AA&A proposes the following time schedule: <br /> • 4th Quarter Groundwater Monitoring Episode: <br /> o Field Work: By 01-11-2010 <br /> o Report: By 02-15-2010 <br /> • Workplan for one well downgradient: By 01-11-2010 <br /> • Workplan for Exposure Path Analysis: By 01-11-2010 <br /> • Workplan for sampling of domestic water wells: By 01-11-2010 <br /> • AA&A's request to SJCEHD for a CD of all case file: Immediately <br /> Comments on the Timetable: <br /> 1. Formulation of the SCM requires evaluation of all data of the case file at <br /> SJCEHD and results of the exposure pathway analysis. <br /> 2. Date for the SCM will be provided when all this data is at hand; <br /> estimated within 12 weeks after completion of the field work for the <br /> exposure pathway analysis. <br /> 3. The domestic water well sampling workplan requires identification of the <br /> wells and their owners and securing of rights to enter and sample. <br /> CONCLUSION: <br /> Comments on the above report and timetable are invited and will be <br /> appreciated. <br /> Written by: <br /> Ami Adini <br /> Principal Project Manager <br /> 4% Ami Adini, President <br /> Ami Adini <br /> w &Asso+ciates,Inc. <br /> Environmental Consultants& Contractors <br /> Rehabilitation of Brownfields <br /> Underground Storage Tank Experts <br /> Phone: 323-913-4073 Fax: 323-667-2336 <br /> Amia(Mamiadi, iq com www.amiadini.rom <br /> 12/14/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.