Laserfiche WebLink
Page 1 of 1 <br /> Vicki McCartney [EH] <br /> From: Larry [larryw@amiadini.com] <br /> Sent: Wednesday, February 23, 2011 5:28 PM <br /> To: Vicki McCartney [EH] <br /> Subject: Frontier Transportation -425 Larch Road -Tracy-- Scheduling of Field Activities <br /> Attachments: FrontierTrans_p01_GWlnvestigation_Figure2_SiteMap_R2.pdf; <br /> FrontierTransport_p01_SJDEH Permit for 523 Larch Rd_09-02-10.pdf; <br /> FrontierTransport_p01_SV1 to SV3_Permit for 425 Larch Rd_01-28-11.pdf <br /> Vicki, <br /> We are preparing to do the field work for two field projects for the Frontier Transportation Case in Tracy as <br /> follows: <br /> 1. Installation of groundwater monitoring well MW28. Attached is a site plan with the proposed location of <br /> MW28 depicted. This location is based upon your letter of January 18, 201 in which you asked for <br /> MW28 to be located adjacent to soil boring B8. <br /> 2. Performing soil-gas sampling from three bore holes SV1, SV2 and SV3. <br /> As you know,we have secured boring/well permits for both of these projects (copies attached for reference). <br /> ing <br /> the <br /> al time. <br /> fiWe were plannng to do the well eld iinspec onlavailability for the weekslof March 7 and March on and the soil gas r1412011t(March 7thoughrMarch 18)?at is your <br /> Once we know your availability,we will establish a firm schedule date(s). <br /> Thank you. <br /> Larry Witwer <br /> Larry Witwer <br /> Senior Project Manager <br /> Cr �_Ssociatesv Inc. <br /> Environmental Consultants & Contractors <br /> Rehabilitation of Brownfields <br /> Underground Storage Tank Experts <br /> Phone: 818-824-81102 Fax: 818-824-8112 <br /> larr)MOamiadini.com www.amiadini.com <br /> 2/24/2011 <br />