Laserfiche WebLink
• 0 Page 3 of 4 <br /> • Programmable Logic Controller(PLC)with digital displays and touch-screen provides safe flame <br /> monitoring at all times and VOC inflow monitoring; <br /> • Integrated Internet Monitoring& Control (IMAC) System allowing real-time, continuous system <br /> monitoring and full adjustment capability via internet; and <br /> • Stainless steel vapor piping <br /> The system required frequent hands-on adjustments to optimize its efficiency against the changing <br /> inflows of masses of vapor; thus resulting in net operational hours averaging 22 hours a day. <br /> Accordingly, we computed the daily operational charge on the basis of 22 operational hours per day, <br /> arriving at a computational net of 28 billable days for the event. <br /> In invoicing the operational time of the extraction unit, AA&A uses cost guidelines established between <br /> the USTCF and CalClean in June of 2007.CalClean's daily rate for events of 28 days is $1,890 per day, <br /> and the rate for 30 days is $1,600.00 per day. As a courtesy to the Client,AA&A bills this event on <br /> the 30-day daily rate for 28 days. As CalClean is regularly marked up 15%by the prime consultant, <br /> we established a USTCF accepted daily rate for the event of$1,840.00. <br /> The field work, methodology, results and recommendations for the fust treatment event are documented <br /> in the Dual-Phase Extraction Remediation Event Report dated April 13, 2012,which was submitted to <br /> the SJCEHD. <br /> Below is a breakdown of the time and costs incurred to complete these tasks: <br /> Labor Charges <br /> Fieldwork Preparation $2,137.50 <br /> Fieldwork $9,918.75 <br /> GeoTracker $900.00 <br /> Project Management $7,882.50 <br /> Project Planning $10,260.00 <br /> APCD Permit $2,752.50 <br /> NPDES Permit $3,873.75 <br /> WDR Permit $517.50 <br /> Regulatory Interaction $600.00 <br /> Report Preparation $8,216.25 <br /> Review, QA/QC $1,202.50 <br /> Task Order/Change Order $180.00 <br /> Equipment/Subcontractor Charges <br /> Equipment Rental $6,098.60 <br /> HVDPE Operation $68,101.70 <br /> Permit Sewer Discharge $591.77 <br /> Subcontractor $29,884.92 <br /> Grand Total$153,118.24 <br /> 7/9/2012 <br />