My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:07:47 PM
Creation date
2/13/2020 11:53:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Action Plan RE: 425 W. Larch Street, Tracy, CA <br /> October 1 , 2008 W&A Project No. : FTIM-08-002 <br /> Summary of Remedial Alternative Casts <br /> Frontier Transportation, Inc. <br /> 425 W. Larch Road <br /> Tracy, CA 95376 <br /> Remedial Alternative Assumptions Cost <br /> Monitored Natural Attenuation Due to the current lack of declining trends 1 . Quarterly monitoring, sampling, and <br /> (MNA) at wells, an additional 20 years of reporting (20 years). Cost per quarter is <br /> quarterly monitoring/reporting is assumed estimated at $6,000 for quaterly sampling and $6803000 <br /> to be needed to reach acceptable goals. analysis and $2,500 for reporting. <br /> No additional well installations are <br /> TOTAL $680,000 <br /> Excavation & Existing above-ground structures will not 1 . Design, Permitting $30,000 <br /> Disposal of Soil be demolished. Proposed dimensions of 2 Soil Excavation, Transportation, & Disposal $520,000 <br /> the excavation would be approximately <br /> 200x8Oxl5 feet (depth). Volume of soil to 3 . Backfilling and compacting $200,000 <br /> be disposed is approximately 8,900 yd 3. 4. On site laboratory (10-days) $25 ,000 <br /> Groundwater concentrations are 5 . Re- install wells $70,000 <br /> anticipated to decline to cleanup goals 6. Monitoring Cost (3 years) $102,000 <br /> within 3 years following excavation; hence <br /> monitoring/sampling/reporting costs are TOTAL $947,000 <br /> estimated for a total of 3 years. <br /> Soil Vapor Extraction and Based on the distribution of impact, 1 . Design, Permitting $ 8,500 <br /> Abatement (SVE) existing wells will be used for SVE. Cost 2. Equipment and Construction $ 140,000 <br /> of utilities is based on a 250 cfm thermal 3 . Life Cycle (O&M-2 year) $487000 <br /> oxidizer with 10 hp blower. Post remedial 4. Laboratory Cost (O&M-2 year) $ 155000 �- <br /> groundwater 5 . Utility Cost (O&M-2 year) $72,000 <br /> monitoring/sampling/reporting for an 6. Monitoring Cost (2 yr + 8 yrs) $3405000 <br /> additional 8 years after completion of SVE <br /> is assumed. TOTAL $623,500 <br /> LNwiaer , ntu 6 assuctares. INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.