Laserfiche WebLink
i <br /> r 1. HEALTH AND SAFETY PLAN <br /> i, Blakely Environmental Investigations, Inc. (BEH), has established this site-specific Health and Safety Plan <br /> (HASP) as part of he work plan for all individuals engaged in Feld assessment activities at the Frontier <br /> Transportation property located at 425 Larch Road, Tracy, CA. All site work shall be conducted in a safe manner <br /> i . and comply with EPA, state and local regulations, in particular OSHA 29 CFR, part 1910, and California <br /> Administrative Code Title 8. In addition, all site work will comply with BEII Corporate Health and Safety Program <br /> and all supporting Standard Operating Procedures. This HASP may be modified during actual field activities, if <br /> necessary, as more information and site-specific data is obtained. <br /> Prior to any work on-site, an approved copy of this HASP (latest edition) shall be provided to all employees <br /> and subcontractors by the Project Manager. Each subcontractor will be responsible for providing their own HASP. <br /> At a minimum the subcontractors' HASP must meet the requirements of this HASP. BEII will review and approve <br /> each subcontractor HASP prior to initiation of field work. <br /> j � 1.1 PURPOSE AND OBJECTIVES <br /> The purpose of this site-specific HASP is to provide guidelines and procedures to ensure the health and <br /> l physical safety of those persons working at the Frontier Transportation property. While it may be impossible to <br /> eliminate all risks associated with site work, the goal is to provide precautionary and responsive measures for the <br /> protection of on-site personnel, the general public and the environment. <br /> r <br /> The HASP objectives are as follows: <br /> tt J <br /> * Ensure the safety of all site personnel <br /> * Protect the public and the environment <br /> * Adhere to BEH Health and Safety procedures <br /> 1 .2 IMPLEMENTATION <br /> This site-specific HASP, and any additions included in a subcontractor HASP, will be reviewed and the <br /> _ Field Team Review Form (Attachment 1 ) will be completed by all site personnel prior to their scheduled field work. <br /> Whenever the site-specific HASP is revised or. amended, personnel will be instructed in the new procedures and <br /> I_ I required to complete a new Field Team Review Form. The site-specific HASP will be implemented in the field by <br /> BEII's Health and Safety Coordinator and/or designated Site Safety Officer. <br /> 11 2.0 BACKGROUND <br /> _ 2.1 SITE LOCATION AND DESCRIPTION <br /> it <br /> i, J The site is located at 425 Larch Road in Tracy. The site is an operating truck yard. Petroleum hydrocarbon <br /> impacted soil and groundwater was identified at the site. <br /> 2*2 SCOPE OF WORK <br /> Excavate potentially impacted soil from the former UST area, abandon an existing monitoring well and <br /> replace with a deeper monitoring well. <br /> 3. RESPONSIBILITIES <br /> 3.1 HEALTH AND SAFETY COORDINATOR <br /> As BEIrs Health and Safety Coordinator (HSC), Hiram Garcia is responsible for directing and <br /> implementing the HASP and ensuring that all BEII and subcontractor personnel have been trained in HASP <br /> !I procedures. The HSC will coordinate safety activities with subcontractors and serve as liaison with public officials <br /> who might wish to monitor health and safety activities on-site. The HSC will also ensure that proper protective <br /> equipment is available and used in the correct manner, that decontamination activities are carried out correctly, that <br /> I 'I <br />