My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 7:07:47 PM
Creation date
2/13/2020 11:53:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9.5.3. 1 SMALL FIRES <br /> (-1 In the event of a small fire at the site, the following actions shall be taken: <br /> i 1 . Evacuate all unnecessary per from the area; <br /> 2. Attempt to extinguish fire using portable fire extinguisher or by smothering (personnel <br /> protective equipment may be required); <br /> 3. Request emergency response assistance (ambulance, local Fire Department, hospital, <br /> poison control center) as appropriate for any injuries or exposures to hazardous <br /> chemicals which occur during suppression of the fire; <br /> 4. Notify the BEII Project Manager and Health and Safety Coordinator; <br /> 5. Notify Frontier Transportation. <br /> 9.5.3.2 LARGE FIRES <br /> In the event of a large fire, or small fire which cannot be extinguished, the following actions shall be taken: <br /> j <br /> I . Evacuate all personnel from the area, preferably to an upwind location; <br /> - � 2. Notify the local Fire Department and other emergency response agencies; <br /> 3 . Notify the BEII Project Manager and Health and Safety Coordinator; <br /> I, + 4. Notify Frontier Transportation. <br /> J <br /> 9.6 EMERGENCY FOLLOW-UP AND EVALUATION <br /> 1 J The BER Field Supervisor will notify the Project Manager and Health and Safety Coordinator <br /> as soon as possible after an emergency situation has been stabilized. The Project Manager will then notify the Frontier <br /> Transportation, appropriate agencies and environmental contacts. If an individual is injures, an Accident/Incident Report <br /> will be filed with the HSC. <br /> 9.7 PROCEDURES FOR REPORTING TO FEDERAL, STATE, AND LOCAL AGENCIES <br /> In all cases, the BEII Project Manager will be notified. He, in tum, will contact the client and any <br /> regulatory agencies. <br /> 9.8 EMERGENCY EVACUATION PROCEDURES <br /> In the event of a site emergency, all workers at the site will be notified by the SSO or designee to stop <br /> work immediately and offer assistance. Those not needed for immediate assistance will decontaminate per normal <br /> procedures and leave the site. <br /> - i 9.9 GENERAL SAFE WORK PRACTICES <br /> -' 9.9.1 MINIMIZATION OF CONTAMINATION <br /> Personnel and equipment used in the contaminated area should be minimized consistent with effective <br /> L. <br />
The URL can be used to link to this page
Your browser does not support the video tag.