Laserfiche WebLink
Boring I Well Log Field Supervisor: J. JaLmin f If Garcia Sheet I of 1 <br /> Project: Frontier Transportation WeH Number. B-6 <br /> Drilling Company: Y8 W DrMngDirect Pugh <br /> Sori►ig Method: <br /> i Dale Dulled: JNit 21, 2000 Bam Hale Depth'' 30' Start Time: 12:43 pm <br /> Water Depth: 9' Finish 1-une: 1:30pm <br /> Graphic well <br /> construction <br /> ASample Description Log <br /> LI <br /> cm <br /> B-6@ Sandy clay, brown, ; <br /> 0 moist, no odor. <br /> Sandy clay, gray, <br /> EI-6@ 142 mo turated, <br /> moist to sa <br /> ' t odor, . <br /> 10 hi h lastici <br /> 10 <br /> ' $_6 Silty sand, brown � <br /> 15, 3.2 dry, slight odor. "* ' 0'-'I <br /> . ; <br /> 15' <br /> Sandy clay, brawn, <br /> B-6 saturated4 �: <br /> @ 2.5 moist to s .. <br /> 24slight plasticity, no odor. +,` <br /> 24 <br /> B-6@1.7 Silty sand, brown, <br /> e <br /> • 25' dry, no odor. <br /> 25 — f <br /> Sandy clay, brawn <br /> B-6@ <br /> 3U' 2.3 moist to saturated, no odor. <br /> 34 <br /> Blakelv Environmental Investleations. Inc. <br />