Laserfiche WebLink
1 <br /> T�,zct_, <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> :lf MONITORING WELL FIELD LOG 2006 <br /> SAMPLE LOCATION I MW - I DATE: 6/23/2006 <br /> 1 PROJECT NAME FRONTIER TRUCKING ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS LARCH ROAD SAMPLE TIME 1150 <br /> CITY STATE TRACY CA SAMPLE CONTAINERS 3 V O A S <br /> SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT BIOPHYSICAL ASSESSMENTS LAB ANALYSIS BY ASC <br />' PROJECT MANAGER DAVE/WINDY MONUMENT FLUSH <br /> SAMPLER DEL-TECH/DON LIGHT WELL CASING MATERIAL PVC <br /> SIGNED _5� WELL CASING DLA 2" / 01632 <br /> SAMPLE MEDIA GROUNDWATER P 1 D READING 1 ODOR NIA NONE <br /> TOP OF CASING ELEVATION MSL COLOR LIGHT BROWN <br /> DEPTH TO WATER feet 100th's 1160 FEET CALC PURGE VOL 201 GAL <br /> DEPTH OF WELL feet 100th's 2392 FEET TOTAL VOLUME PURGED 603 GAL <br /> STANDING WATER COLUMN 1232 FEET DEPTH OF PUMP 23 FEET <br /> I � FTMEB P7MMETERS <br /> TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORP DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE D T W GPMILPM amts HOS C,,I.. M,,.I, P T U <br /> 0 N/A 1 0 GPM 740 2345 208 223 174 LT BROWN <br /> 2 Oi 726 2354 204 221 1 37 " <br /> 402 7 18 2389 206 2197 050 <br /> 603 750 2423 205 219 I 46 " <br /> IPURGE METHOD CENTRIFUGAL,PUMP <br /> SAMPLE METHOD DEDICATED TUBING <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 1161' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS GOOD RECHARGE <br /> WEATHER CLEAR SKIES/HOT WIND NW5 <br /> QUALITY CONTROL ALL PURGING E UIPMENTAND SAMPLING E UIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEWNITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL.POLY DRUM <br /> INSTRUMENTATION YSL 556 MULTIPItOBE Y S L DISSOLVED OX7 GEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B PLD <br /> KECK INTERFACE METER TURBIDITY METER <br /> #�OF DRUMS ON SIGHT WATER 9 SOIL 0 <br /> f <br />