Laserfiche WebLink
I <br /> 1 <br /> r� <br /> - DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD LOG 2006 <br /> SAMPLE LOCATION/MW - 19 DATE. 6/23/2006 <br /> PROJECT NAME FRONTIER TRUCKING ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS LARCH ROAD SAMPLE TIME 1200 <br />' CITY STATE TRACY CA SAMPLE CONTAINERS 3 V 0 A'S <br /> SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT BIOPHYSICAL ASSESSMENT'S LAB ANALYSIS BY ASC <br />' PROJECT MANAGER DAVE 1 WINDY MONUMENT FLUSH <br /> SAMPLER DEL-TECH/DON LIGHT WELL CASING MATERIAL PVC <br /> SIGNED 'e- WELL CASING DIA 2" 1 01632 <br /> SAMPLE MEDIA GROUNDWATER P I.D READING/ODOR NIA NONE <br />' TOP OF CASING ELEVATION MSL COLOR BROWN <br /> DEPTH TO WATER feeL100th's 1154 FEET CALC PURGE VOL 131 GAT: <br /> DEPTH OF WELL feet.100th's 1955 FEET TOTAL VOLUME PURGED 392 GAL <br /> STANDING WATER COLUMN 901 FEET DEPTH OF PUMP 19 FEET <br /> FIELD PARAMETERS <br />' TIME CUMULATIVE DRAW PUMPING pH E C TEMP O RP DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE D T W) (—ts) (UMHOS Celsius volts PM (NTU) <br /> 0 N/A 1 0 GPM 717 3008 234 219 089 BROWN <br />' <br /> 131 " 709 3522 212 217 090 " <br /> 261 718 3649 230 214 074 " <br /> 392 726 3153 1 206 212 109 " <br />' PURGE METHOD CENTRIFUGAL PUMP <br /> SAMPLE METHOD DEDICATED TUBING <br />' D T W AFTER PURGE D T W AT SAMPLE TIME 14 53' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br />' WEATHER CLEAR SKIES/HOT WIND <br /> UALITY CONTROL ALL PURGING E UIPMENT AND SAMPLING EQUIPMENT WAS CLEANED IN THE <br />' FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEWNITRILE GLOVES <br /> CONTAINMENT DOT 17 SS GAL.STEEL DRUMOR 60 GAL POLYDRUM <br /> INSTRUMENTATION Y S I 556 MULTTROBE Y S L DISSOLVED OXYGEN METER <br />' SOLINIST SLOPE METER THERMODINE 5808 P I D <br /> KECK NTERFACE METER TURBIDITY METER <br /> 1 <br />