Laserfiche WebLink
I <br /> 1 <br /> DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br /> MONITORING WELL FIELD,LOG 2006 <br /> SAMPLE LOCATION/MW - 18 DATE 3/31/2006 <br /> 1 PROJECT NAME FRONTIER TRUCKING ANALYSIS PERFORMED SEE CHAIN OF CUSTODY <br /> ADDRESS LARCH ROAD SAMPLE TIME 1159 <br />' CITY STATE TRACY CA SAMPLE CONTAINERS 3 V O A'S <br /> SITE CONTACT PRESERVATIVES HCL <br /> CONSULTANT BIOPHYSICAL ASSESSMENTS LAB ANALYSIS BY <br />' PROJECT MANAGER DAVE/WINDY MONUMENT FLUSH <br /> SAMPLER DEL-TECH/DON LIGHT WELL CASING MATERIAL PVC <br /> SIGNED --'$ WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING I ODOR N/A NONE <br /> TOP OF CASING ELEVATION MSL COLOR CLEAR <br /> DEPTH TO WATER feet 100th's 1 1 43 FEET CALC PURGE VOL 445 GAL <br /> DEPTH OF WELL feet 100th's 38 72 FEET I TOTAL VOLUME PURGED 13 36 GAL <br /> STANDING WATER COLUMN 2729 FEET I DEPTH OF PUMP 37 FEET <br />' • FIELD PARAMETERS <br />' TIME CUMULATIVE DRAW PUMPING pH E C TEMP ORP DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE D T W (GPMILPM) umfs (UMHOS) Celseus Mvelts (PPM N T U <br /> 0 N/A 1 0 GPM 6 93 3278 209 1010 12 CLEAR <br />' <br /> 445 691 3205 21 0 1089 12 " <br /> 891 690 3214 1 210 1116 12 <br /> 1336 689 3235 21 0 1140 13 " <br /> I <br /> PURGE METHOD CENTRIFUGAL PUMP <br /> SAMPLE METHOD DEDICATED TUBING <br />' D T W AFTER PURGE D T W AT SAMPLE TIME 16 54' <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br />' WEATHER OVERCAST/COLD WIND <br /> UALITY CONTROL ALL PURGING E UIPMENTAND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 1755 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S 1 556 MULTIPROBE Y S I DISSOLVED OXYGEN METER <br /> r <br /> SOLIN IST SLOPE METER THERMODINE 5808 P 1 D <br /> KECK INTERFACE METER TURBIDITY METER <br /> • <br /> r <br /> r <br />