Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0) INTRODUCTION •1 <br /> 2.0) SITE LOCATION AND HISTORY .1 <br />' 3.0 SITE GEOLOGY/HYDROGEOLOGY .3 <br /> 4.0) PROPOSED CORRECTIVE ACTION METHODS .3 <br /> 4.1) Contaminant Mass .4 <br />' 4.2) Ozone Injection /Sparging .4 <br /> 4.3) Excavation .6 <br /> 4.4) Soil Vapor Extraction (SVE) .6 <br />' .7 <br /> 5.0) CONCLUSIONS , <br /> I6.0) RECOMMENDATIONS •8 <br /> IFIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Layout Map <br /> Figure 3 Groundwater Gradient Map <br /> Figure 4 Dissolved TPH-gas Isoconcentration Map <br />' Figure 5 Dissolved Benzene Isoconcentration Map <br /> Figure 6 Dissolved MTBE Isoconcentration Map <br /> Figure 7 BEII North to South Lithologic Cross Section Along A-A' <br />' Figure 8 BEH East to West Lithologic Cross Section Along B-B' <br />' TABLES <br /> Table 1 Groundwater Monitoring Results <br /> Table 2 Previous Soil Sample Analysis Results <br />' APPENDICES <br /> Appendix A Supplemental Data for Adsorbed Phase Partitioning, Excavation, SVE <br />' Appendix B Calculations for Mass of Dissolved Contaminants <br />