Laserfiche WebLink
Stan' Rancho Cordova Office Stantec Conf tting Corporation 7S 2Z� <br /> 3017 Kilgore Road Stantec Company Contact(s)for Invoice: PROJECT No DATE: <br /> Rancho Cordova, CA Dan Schreiner, Stantec Project Manager PAGE: <br /> email-anthony.giglini@stantec.com 211402828.300.250 OF (� <br /> TEL: (916)861-0400 FAX: (916)861-0430 cc:kristen.burba@stantec.com <br /> Project Name: <br /> 4Q10 Monitoring and Sampling Event Sampler(s):Pnmed Name Lab <br /> Address: KIFF ANALYTICAL <br /> Parcel#2A SAMPLE S).(SIGNATURE) LA][�;U$EflNt-Y. <br /> W.Weber at N. Lincoln, Stockton,CA nn <br /> TURNAROUND TIME(BUSINESS DAYS) <br /> ❑10 DAYS Ei—h DAYS ❑ 72 HR ❑ 48 HR ❑ 24 HR ❑ <24 HR REQUESTED ANALYSIS <br /> 5-Day(Standard TAT) LI M <br /> o <br /> 0 <br /> 0 <br /> SPECIAL INSTRUCTIONS OR NOTES: TEMPERATURE ON RECEIPT(C) m t v w <br /> CL : <br /> da w a 0 <br /> Aa T W Z <br /> EDF Deliverable. Please use the following reporting limits: W o ;� <br /> oa <br /> 0 <br /> M o <br /> VOC's- 0.5 ppb; TPHg/TPHdlTPH motor oil-50 ppb; <br /> BTEX/MtBE/DIPE/TAME/EtBE- 0.5 ppb; TBA-5 ppb, Ethanol-50 ppb, Methanol- o = ° 1° <br /> A v E J <br /> 100 ppb w m R a <br /> M W c In lz <br /> aJS SAMPLING MATRIX No.of PRESERVE p1 W C •° '� d <br /> Field Sample Identification CONT. = a L W <br /> QN4Y DATE TIME p W � H p <br /> QCEB-1-RM ff -16 13* Water 8 HCl X X X <br /> -Water 8 HCl _- <br /> E Water 8 HCI <br /> v <br /> (D Relinquished by:(Signature) Received by:(Signature) Time: <br /> v Relinquish e by:(Signature) Received by:(Signature) Time: <br /> W Relinquished by:(Signature) R ed by: ign re) T m <br /> F �� `c ►o 13b <br />