Laserfiche WebLink
STOCKTON DEPARTMENT OF <br /> PROJECT: HOUSING AND REDEVELOPMENT Log of Boring 1 OB-21 <br /> Stockton, California PAGE 1 OF 1 <br /> • Boring location: See Site Plan. Figure 1 Logged by: M. Rapoport <br /> Date started: 4/18/00 Date finished: 4/18/00 <br /> Drilling method: Direct Push <br /> Hammer weight/drop: NA Hammer type: NA <br /> Sampler: Continuous Core <br /> SAMPLES > <br /> ►_- (Da o MATERIAL DESCRIPTION <br /> d <br /> W Sample n o <br /> Ple 3 6 2 <br /> 2 <br /> v Number a) -Q O <br /> SILT with GRAVEL(ML) <br /> 1 0B-21-1. ::>:: 0 light brown, moist, medium stiff, trace concrete and brick <br /> ML <br /> 2— x <br /> 3-10B-21-3.(= 0 <br /> a CLAY(CL) <br /> 4 dark brown, moist, medium stiff,trace gravel <br /> 5 <br /> 6 <br /> oB-21-6. :: 0 CL <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> • 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 0 24 <br /> 25 <br /> 0 <br /> 26 <br /> a 27 <br /> 0 <br /> 28 <br /> N <br /> • < 29 <br /> 2 30 <br /> p Boring terminated at 8 feet below ground surface(bgs). Tr�dwe118tRo�lo <br /> X No groundwater encountered during drilling. <br /> z <br /> F Project No.: Figure: <br /> Lu 2597.03 A-19 <br />