Laserfiche WebLink
STOCKTON DEPARTMENT OF <br /> PROJECT: .HOUSING AND REDEVELOPMENT Log of Boring 1 OB-5 <br /> Stockton, California PAGE 1 of 1 <br /> Boring location: See Site Plan. Figure 1 Logged by: M. Rapoport <br /> Date started: 4/18/00 Date finished: 4/18/00 • <br /> Drilling method: Direct Push <br /> Hammer weight/drop: NA Hammer type: NA <br /> Sampler: Continuous Core <br /> = SAMPLES e <br /> a 4 a a o MATERIAL DESCRIPTION <br /> LL .� Sample 3— <br /> O V Number is gO J <br /> SILT with GRAVEL(ML) <br /> 1 10B-5-1.0 >:>;: 0 light brown, moist, medium stiff,trace brick and concrete <br /> ML <br /> 2 <br /> brick debris <br /> 3 106-5-3.0 >::::» 0 <br /> 0 CLAY(CL) <br /> 4 dark brown, moist, high plasticity, medium stiff <br /> 5 <br /> 106-5 6.0: :.3 0 <br /> 6 CL <br /> 7- <br /> 0 <br /> 8- <br /> 9- <br /> 10- <br /> 11- <br /> 12- <br /> 13- <br /> 14- <br /> 15- <br /> 16- <br /> 17- <br /> 18- <br /> 19- <br /> 20- <br /> 21- <br /> 22- <br /> 23- <br /> 0 <br /> 9101112 13141516171819202122230 24 <br /> 25 <br /> 0 <br /> C 26 <br /> a 27 <br /> 0 <br /> 28 <br /> N <br /> a <br /> 29 <br /> z <br /> z 30 • <br /> W <br /> p Boring terminated c 8 feet below ground surface(bgs). T OI'O <br /> � No groundwater encountered during drilling. <br /> z <br /> W <br /> Project No.: Figure: <br /> 2597.03 A-3 <br />