Laserfiche WebLink
PROJECT: STOCKTON DEPARTMENT OF <br /> HOUSING AND REDEVELOPMENT Log of Boring 11B-15 <br /> Stockton, California PAGE 1 OF 1 <br /> • Boring location: See Site Plan. Figure 1 Logged by: M. Rapoport <br /> Date started: 4/18/00 Date finished: 4/18/00 <br /> Drilling method: Direct Push <br /> Hammer weight/drop: NA Hammer type: NA <br /> Sampler: Continuous Core <br /> = SAMPLES E <br /> aw a MATERIAL DESCRIPTION <br /> W Sample n 3 5 <br /> v Number m° O <br /> J <br /> SANDY CLAY(CL) <br /> 1 16 15-1' '.., 0 CL dark brown,moist, medium stiff, medium plasticity,trace gravel <br /> 2 <br /> SILT with SAND(ML) <br /> 3 16-15-3. ... 0 red-brown, moist, medium stiff,trace clay,slight mottling <br /> 0 <br /> 4— 7. <br /> 5 ML <br /> 6-11B-15-6.(M 0 <br /> 7- <br /> 8- <br /> 9- <br /> 10— <br /> '1_891011 <br /> • 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> C, 24 <br /> 25- <br /> 26- <br /> 27- <br /> 28- <br /> 29— <br /> z <br /> 526272829 <br /> 30 <br /> p Boring terminated at 8 feet below ground surface(bgs). <br /> No groundwater encountered during drilling. <br /> z I ER01��0 <br /> > 1lJ(1 l <br /> Lu <br /> Project No.: Figure: <br /> LU <br /> 2597.03 A-26 <br />