My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 6:26:46 PM
Creation date
2/13/2020 2:35:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SEPARATE PHASE HYDROCARBON INVESTIGATION UNOCAL EXTRACTION WELL PILOT STUDY 2011
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> Report of Findings for the Waterfront Towers Separate Phase Hydrocarbon Investigation <br /> and Unocal Extraction Well Pilot Study <br /> Waterfront Towers Parking Lot <br /> March 4, 2011 <br /> HydropunchTM sampling device in soil boring SB-7. Results are summarized in SECOR's <br /> Additional Assessment Report and Work Plan for Additional Deep Groundwater Zone <br /> Assessment, dated July 29, 2004. <br /> The initial start-up of the DPE system was performed on August 2 and 3, 2004. Due to <br /> concerns associated with operating the DPE system during the removal of former pipelines <br /> found near the remediation system compound, the DPE system was temporarily deactivated on <br /> August 3, 2004. The remediation system conveyance lines and nearby sewer and water lines <br /> were also dismantled to accommodate the excavation of the abandoned former pipelines and <br /> surrounding petroleum hydrocarbon-impacted soil. The DPE system was reconnected, brought <br /> on-line on December 14, 2004, and operated during 1Q and 2A05. <br /> During the 1Q05, six horizontal SVE wells were installed beneath five apartment buildings within <br /> the Delta View Apartment complex. A final report documenting the pipeline abandonment, soil <br /> excavation, and horizontal SVE well installations was submitted to the CRWQCB-CVR and the <br /> Department of Toxic Substance Control (DTSC). This report is entitled Pipeline Removal, <br /> Abandonment, Soil Excavation, On-Site Horizontal SVE Well Installation, and Horizontal SVE <br /> Well Installation Beneath Delta View Apartments Report and Work Plan for Pipeline Removal, <br /> Abandonment, and Soil Excavation in Waterfront Towers Parking Lot, dated February 10, 2005, <br /> From March 21 through April 10, 2005, seven B-zone groundwater monitoring wells (MW-47 <br /> through MW-53), one groundwater monitoring well intended to be a C-zone well (MW-54), and <br /> one groundwater monitoring well intended to be a D-zone well (MW-55) were installed, and <br /> three Geoprobe soil borings (GP-1 through GP-3) were advanced. Results are summarized in <br /> SECOR's Additional Deep Groundwater Zone Assessment Report, dated May 25, 2005. <br /> From July 13 through July 15, 2005, 16 soil vapor points were installed to monitor soil gas <br /> concentrations over time and determine radius of influence of the previously installed SVE <br /> system. On July 19 and 20, 2005, baseline soil vapor samples were collected from 12 of the 16 <br /> vapor points. The SVE system was initiated on August 18, 2005 for select wells. The complete <br /> scope of work and results of the soil vapor well installations, SVE start-up, and soil vapor <br /> sampling were summarized in SECOR's Soil Vapor Well Installation and Soil Vapor Extraction <br /> Start-Up Report, dated November 30, 2005. <br /> From March 21 through March 23, 2006, additional assessment activities were conducted at the <br /> Site in accordance with the Work Plan submitted January 4, 2006 entitled Work Plan for <br /> Additional DPE Feasibility Testing and Expanded Remedial System Installation. Seven <br /> piezometers (PZ-1 through PZ-7) and one DPE well (DPE-13) were advanced for the purpose of <br /> conducting radius-of-influence analysis on several existing DPE wells. <br /> • Pilot testing on DPE wells was conducted between April 4 and April 26, 2006. A temporary <br /> aboveground extraction line was installed on DPE-13 and MW-40 as part of these pilot testing <br /> 2.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.